Aim: To describe the evolution and results of health projects run in hospitals and managed by Nursing Coordinators.
Methods: A convenience sample of 13 north Italian hospital, and a sample of 56 Nursing Coordinators with a permanent position from at least 1 year, was contacted. The following information was collected with a structured interview: projects run in 2009, topic, if bottom up or top down, number of staff involved and state (ended, still running, stopped).
Results: In 2009 Nursing Coordinators started 114 projects (mean 1.8±1.2 each): 94 (82.5%) were improvement projects, 17 (14.9%) accreditation, and 3 (2.6%) research. The projects involved 2.732 staff members (73.7%; average commitment 84 hours); 55 (48.2%) projects were still running, 52 (45.6%) completed, for 5 (4.4%) there was no assessment and 2 (1.8%) had been stopped.
Conclusions: Nurses are regularly involved in several projects. A systematic monitoring of the results obtained and stabilization strategies are scarce. Due to the large number of resources invested, a correct management and the choice of areas relevant for patients' problems and needs are pivotal.