High Wycombe railway station: Difference between revisions

Content deleted Content added
Citation bot (talk | contribs)
Add: title. Changed bare reference to CS1/2. | Use this bot. Report bugs. | Suggested by BrownHairedGirl | Linked from User:BrownHairedGirl/Articles_with_bare_links | #UCB_webform_linked 1963/2197
 
(15 intermediate revisions by 9 users not shown)
Line 1:
{{Short description|Railway station in Buckinghamshire, England}}
{{About|the railway station in Buckinghamshire, England|the under construction railway station in Perth, Western Australia|High Wycombe railway station, Perth}}
{{Use dmy dates|date=May 2015}}
{{Use British English|date=May 2015}}
Line 29:
| events3 = Services to Bourne End withdrawn
| mpassengers =
{{Rail pass box |pass_year=2016/17 |passengers={{increase}} 2.910 million}}
{{Rail pass box |pass_year=2017/18 |passengers={{increase}} 3.000 million |interchange={{pad|1em}}{{increase}} 86,580}}
{{Rail pass box |pass_year=2018/19 |passengers={{increase}} 3.071 million |interchange={{pad|1em}}{{increase}} 96,361}}
{{Rail pass box |pass_year=2019/20 |passengers={{decrease}} 2.857 million |interchange={{pad|1em}}{{decrease}} 86,443}}
{{Rail pass box |pass_year=2020/21 |passengers={{decrease}} 0.543 million |interchange={{pad|1em}}{{decrease}} 13,716}}
{{Rail pass box |pass_year=20162021/1722 |passengers={{increase}} 21.910624 million |interchange={{pad|1em}}{{increase}} 59,927}}
{{Rail pass box |pass_year=20172022/1823 |passengers={{increase}} 31.000917 million |interchange={{pad|1em}}{{increase}} 8691,580589}}
| footnotes = Passenger statistics from the [[Office of Rail and Road]]
|mapframe=yes
Line 58:
[[British Rail]] closed the original branch line to [[Maidenhead railway station|Maidenhead]] on 2 May 1970 and subsequently the track was lifted.<ref>{{cite web |url= http://www.mmpa.org.uk/history.html |work=Local History |title=The Post-Beeching Era |publisher=Marlow&nbsp;— Maidenhead Passengers' Association }}</ref>
 
The station was transferred from the [[Western Region of British Railways|Western Region of British Rail]] to the [[London Midland Region of British Railways|London Midland Region]] on 24 March 1974.<ref>{{cite journalmagazine |editor1-lasttitle=Slater |editor1-first=J.N. |date=May 1974 |title=Notes and News: Transfer of Marylebone-Banbury services |journal magazine=[[The Railway Magazine]] |volume=120 |issue=877 |publisherdate=IPC Transport Press LtdMay 1974|location=London |issn=0033-8923 |page=248 28}}</ref>
 
In November 2005 a fire in the ticket office gutted the roof of the building.<ref>{{cite news |url= http://news.bbc.co.uk/1/hi/england/beds/bucks/herts/4476286.stm |title=Station blaze disrupts journeys |publisher=BBC |date=27 November 2005 }}</ref> The restored station building reopened in September 2007.<ref>{{cite web|url=http://www.chilternrailways.co.uk/news/news-archive/high-wycombe-station-restored-after-fire/ |title=High Wycombe station restored after fire |publisher=[[Chiltern Railways]] }} {{dead link|date=June 2016|bot=medic}}{{cbignore|bot=medic}}</ref>
 
In April 2015 the Northbound platform was lengthened.<ref>{{cite web |url=https://www.chilternrailways.co.uk/high-wycombe-upgrade |url-status=dead |archive-url=https://web.archive.org/web/20150730235904/http://www.chilternrailways.co.uk/high-wycombe-upgrade |archive-date=30 July 2015 |title=High Wycombe upgrade {{!}} Chiltern Railways}}</ref> The subway was closed and has now been replaced with a footbridge with a lift at each end.<ref>{{cite tweet|number=774141996998897665|user=chilternrailway|title=@RachelV06 Hi there, yes, there is now a lift at High Wycombe station, it is by the bridge. BL|date=9 September 2016}}</ref>
 
==Services==
[[File:High Wycombe - Chiltern 168109 (168219).JPG|thumb|right|A {{brc|168}} going to London calls at High Wycombe as a northbound service approaches]]
All trains are operated by Chiltern Railways. The current off-peak services are:<ref>{{Cite web|url=http://www.chilternrailways.co.uk/download-our-timetable|title = Download Train Timetables & Check Times &#124; |website=Chiltern Railways|access-date=7 July 2023}}</ref>
 
*5 trains per hour to [[Marylebone railway station|London Marylebone]], of which:
**2 are non-stop to London Marylebone
**2 semi-fast, calling at [[{{rws|Beaconsfield|England}}, railway{{rws|Gerrards station (Buckinghamshire)|Beaconsfield]]Cross}} and [[Gerrardssometimes Crossone railwayother station|Gerrards Cross]].
**1 localstopping service, calling at Beaconsfield and Gerrards Cross as well as othermost intermediate stations, which originates atfrom High Wycombe.
* 1 train per hour to {{rws|Birmingham Moor Street}}.
* 1 train per hour to {{rws|AylesburyBanbury}}, with 1 train per 2 hours extending to {{rws|Birmingham Snow Hill}}.
* 12 traintrains per hour to {{rws|BanburyOxford}}.
* 1 train per hour to {{rws|Oxford}} calling at {{rws|Bicester Village}}.
 
High Wycombe has a bay platform, Platform 1, from which additional peak-hour local services run to and from London Marylebone. It is also used by a terminating weekdays only [[Parliamentary train|parliamentary service]] from [[West Ealing railway station|West Ealing]] via the [[Greenford branch line|Greenford line]].<ref>[https://web.archive.org/web/20181206002950/http://www.realtimetrains.co.uk/train/C91485/2018/12/18/advanced 2M27 1147 West Ealing to High Wycombe] Real Train Times 10 December 2018</ref> Until December 2018 it operated from [[Paddington railway station|London Paddington]] via the [[Acton-Northolt line]].<ref>[https://web.archive.org/web/20181205074909/http://www.realtimetrains.co.uk/train/C71972/2018/12/07/advanced 2M29 1135 London Paddington to High Wycombe] Real Train Times 7 December 2018</ref>
 
===Future===
High Wycombe is to gain further rail links north of Aylesbury to [[Winslow railway station|Winslow]] and [[Milton Keynes Central railway station|Milton Keynes]] by 2030 as part of the [[East West Rail]] project.<ref>{{Cite web |url=http://www.eastwestrail.org.uk/train-services/ |title=East West Rail: train services |access-date=9 November 2015 |archive-url=https://web.archive.org/web/20160517170742/http://www.eastwestrail.org.uk/train-services/ |archive-date=17 May 2016 |url-status=dead }}</ref>{{Update inline|date=July 2023|reason=Aylesbury-Winslow now unlikely to be built.}}
 
{{s-rail -start}}
{{s-rail|title=National Rail}}
{{rail line |next={{rws|Beaconsfield|Buckinghamshire}} |previous={{rws|Saunderton}} |route=[[Chiltern Railways]]<br /><small>[[Chiltern Main Line]]</small> |col={{Chiltern colour}}}}
{{s-rail line -national|nextprevious={{rws|London Marylebone}} |previoustoc={{rws|BicesterChiltern Village}}Railways|route=[[Chiltern RailwaysMain Line]]<br /><small>London Marylebone&nbsp;— Oxford</small>– Birmingham Snow Hill|colnext={{ChilternBicester colour}}North|rows1=3|rowsmid=3}}
{{s-rail-national|hide1=yes|hidemid=yes|next=Haddenham & Thame Parkway}}
{{rail line|previous={{stnlnk|West Ealing}}|route=[[Chiltern Railways]]<br /><small>[[Greenford Branch Line|Greenford line (limited service)]]<br />Monday - Friday only</small> |col={{Chiltern colour}} }}
{{s-rail-national|hide1=yes|hidemid=yes|next=Princes Risborough|rows2=2}}
{{s-rail-national|previous=Beaconsfield|county1=England|toc=Chiltern Railways|route=London Marylebone – Oxford|next=Princes Risborough|rows1=3|rowsmid=2|hide2=yes}}
{{s-rail-national|hide1=yes|hidemid=yes|next=Saunderton}}
{{s-rail-national|hide1=yes|toc=Chiltern Railways|route= Birmingham Snow Hill - High Wycombe - London Marylebone <br> (Stopping service)}}
{{Disused Rail Insert}}
{{rail line |next={{rws|Loudwater}} |route=[[Great Western Railway]]<br /><small>[[Wycombe Railway]]</small><br /><small>Until 1970</small> |col={{GWR colour}} }}
{{s-end}}
 
Line 106 ⟶ 107:
[[Category:Former Great Western and Great Central Joint Railway stations]]
[[Category:Railway stations in Buckinghamshire]]
[[Category:DfT Category C1 stations]]
[[Category:Railway stations in Great Britain opened in 1854]]
[[Category:High Wycombe]]