Line 4 (Wuhan Metro): Difference between revisions

Content deleted Content added
No edit summary
No edit summary
 
(9 intermediate revisions by 6 users not shown)
Line 2:
{{Infobox rail line
| name =
| logo = {{huge|{{rint|wuhan|4}}}}WHM_Line_4_icon.svg
| logo_width = 100px
| color = {{rcr|WHM color|4}}
| image = Wangjiawan Station.JPG
| image_width = 265px
Line 14:
| status =
| locale = [[Wuhan]], [[Hubei]]
| start = {{stl|WHM stations|Bailin}}<ref name=sina1004>{{cite web|url=https://news.sina.com.cn/c/2019-10-04/doc-iicezuev0052697.shtml|date=2019-10-04|title=被调侃开往德国 武汉地铁柏林站注音改为"bailin"}}</ref>
| end = {{stl|WHM stations|Wuhan}}
| stations = 37
| routes = 1
| daily_ridership = 750,000 (2017 Daily)<ref name="武汉轨道交通最高客流">{{cite web | url=http://ctjb.cnhubei.com/html/ctjb/20170405/ctjb3089625.html | title=武汉地铁客流爆棚连续两天刷新纪录 | access-date=2017-04-03 | archive-url=https://web.archive.org/web/20170825184909/http://ctjb.cnhubei.com/html/ctjb/20170405/ctjb3089625.html | archive-date=2017-08-25 | url-status=dead }}</ref>
| open = {{Start date and age|2013|12|28}}<ref name="开通"/>
| close =
Line 39:
The '''Line 4 of Wuhan Metro''' ({{zh|武汉地铁4号线}}) is the third line in [[Wuhan Metro]] system, and it will be the second metro line crossing the [[Yangtze river]] in [[Wuhan]]. It is colored grass-green, which is the identifying color of this line, which would appear on its trains, station signs, and the official subway map.
 
The whole construction was divided into two parts, being phase 1 and 2, which opened in 2013 and 2014, respectively. Phase 1, opened on December 28, 2013, runs through [[Wuchang District|Wuchang]] in a northeast-southwest direction, connecting {{stl|WHM stations|Wuhan}}, {{stl|WHM stations|Wuchang}} and major commercial districts.<ref name="开通">{{cite web | url=http://news.cjn.cn/sywh/201312/t2406280.htm | title=地铁4号线昨日开通 武汉地铁网络时代开启 | access-date=2013-12-28}}</ref> Phase 2 willopened runa year later and runs in an east-west direction, linking [[Hanyang District|Hanyang]] and Wuchang, tunneling through the Yangtze river in the proximity of the [[Wuhan Yangtze River Bridge|first Yangtze river bridge]] and connecting with phase 1 at Wuchang railway station.<ref name="whdtkg200812">{{cite web | publisher =荆楚网 | script-title=zh:武汉步入立体交通时代 2015年建成六桥一隧三地铁 | url =http://news.cnhubei.com/ctjb/ctjbsgk/ctjb47/200812/t532735_1.shtml | date = 2008-12-22 | access-date =2010-01-23 | language =zh }}</ref>
 
The opening of phase 1 of Line 4 will form the skeleton of Wuhan's metro system. Right after its opening, the system (including [[Line 1, Wuhan Metro|Line 1]], [[Line 2, Wuhan Metro|2]], and 4) will be able to accommodate millions of passengers a day, where a large proportion of them will be the cross-Yangtze passengers. But all stations on line 4 have been designed only to accommodate a six-car train (type B) in length and have no possibility to extend for future upgrading.
Line 75:
 
==Stations==
[[File:Entrance A of ChuheHanjie Station.jpg|thumb|Entrance of Metro[[Chuhehanjie station]].]]
<!--Phase 1 stations are (from south to north): Wuchang railway station, Meiyuanxiaoqu, Zhongnanlu, Hongshan Guangchang, Zhoujiadawan, Qingyuzui, Dongting, Yuejiazui, Tiejicun, Luojiagang, Yuanlilu, Gongye Dadao, Gongyesilu, Yangchunhu, Wuhan railway station.
 
Phase 2 stations are (from west to east): Huangjinkou, Mengjiapu, Yong'antang, Meiguiyuan, Wangjiawan, Shilipu, Qilimiao, Wulidun, Hangyang railway station, Zhongjiacun, Lanjianglu, Fuxinglu, Shouyilu. (Connect Wuchang railway station of phase 1.)-->
 
(Station names might change according to official system map and schedule).
 
{| class="wikitable"
Line 91 ⟶ 89:
! {{small|English}}
! {{small|Chinese}}
|- style = "background:#{{rcr|WHM color|4}}; height: 2pt"
| colspan="8" |
|-
|align="center"|●||align="center"|
|{{stl|WHM stations|Bailin}}<ref name=sina1004>{{cite web|url=https://news.sina.com.cn/c/2019-10-04/doc-iicezuev0052697.shtml|date=2019-10-04|title=被调侃开往德国 武汉地铁柏林站注音改为"bailin"}}</ref>
|{{large|{{lang|zh-cn|柏林}}}}
|
Line 103 ⟶ 101:
|-
|align="center"|●||align="center"|
|{{stl|WHM stations|Xinmiaocun}}
|{{large|{{lang|zh-cn|新庙村}}}}
|
Line 110 ⟶ 108:
|-
|align="center"|●||align="center"|
|{{stl|WHM stations|Linzhang Boulevard}}
|{{large|{{lang|zh-cn|临嶂大道}}}}
|
Line 117 ⟶ 115:
|-
|align="center"|●||align="center"|
|{{stl|WHM stations|Caidian Square}}
|{{large|{{lang|zh-cn|蔡甸广场}}}}
|
Line 124 ⟶ 122:
|-
|align="center"|●||align="center"|
|{{stl|WHM stations|Fenghuang Road}}
|{{large|{{lang|zh-cn|凤凰路}}}}
|
Line 131 ⟶ 129:
|-
|align="center"|●||align="center"|
|{{stl|WHM stations|Xinnong}}
|{{large|{{lang|zh-cn|新农}}}}
|
Line 138 ⟶ 136:
|-
|align="center"|●||align="center"|
|{{stl|WHM stations|Zhiyin}}
|{{large|{{lang|zh-cn|知音}}}}
|
Line 145 ⟶ 143:
|-
|align="center"|●||align="center"|
|{{stl|WHM stations|Jixian}}
|{{large|{{lang|zh-cn|集贤}}}}
|
Line 152 ⟶ 150:
|-
|align="center"|●||align="center"|
|{{stl|WHM stations|Xintian}}
|{{large|{{lang|zh-cn|新天}}}}
|
Line 159 ⟶ 157:
|-
|align="center"|●||align="center"|
|{{stl|WHM stations|Huangjinkou}}
| {{large|{{lang|zh-cn|黄金口}}}}
| <!--{{rint|wuhan|11}}-->
Line 167 ⟶ 165:
|-
|align="center"|●||align="center"|
|{{stl|WHM stations|Mengjiapu}}
| {{large|{{lang|zh-cn|孟家铺}}}}
|
Line 174 ⟶ 172:
|-
|align="center"|●||align="center"|
|{{stl|WHM stations|Yong'antang}}
| {{large|{{lang|zh-cn|永安堂}}}}
|
Line 181 ⟶ 179:
|-
|align="center"|●||align="center"|●
|{{stl|WHM stations|Yulong Road}}
| {{large|{{lang|zh-cn|玉龙路}}}}
|
Line 188 ⟶ 186:
|-
|align="center"|●||align="center"|●
|{{stl|WHM stations|Wangjiawan}}
| {{large|{{lang|zh-cn|王家湾}}}}
| {{rint|wuhan|3}}
Line 195 ⟶ 193:
|-
|align="center"|●||align="center"|●
|{{stl|WHM stations|Shilipu}}
| {{large|{{lang|zh-cn|十里铺}}}}
|
Line 202 ⟶ 200:
|-
|align="center"|●||align="center"|●
|{{stl|WHM stations|Qilimiao}}
| {{large|{{lang|zh-cn|七里庙}}}}
|
Line 209 ⟶ 207:
|-
|align="center"|●||align="center"|●
|{{stl|WHM stations|Wulidun}}
| {{large|{{lang|zh-cn|五里墩}}}}
|
Line 216 ⟶ 214:
|-
|align="center"|●||align="center"|●
|{{stl|WHM stations|Hanyang}}
| {{large|{{lang|zh-cn|汉阳火车站}}}}
| {{nowrap|{{rint|cn|rail|link=Hanyang railway station}} [[Hanyang railway station|HYN]]}}
|1.012
Line 223 ⟶ 221:
|-
|align="center"|●||align="center"|●
|{{stl|WHM stations|Zhongjiacun}}
| {{large|{{lang|zh-cn|钟家村}}}}
| {{rint|wuhan|6}}
Line 230 ⟶ 228:
|-
|align="center"|●||align="center"|●
|{{stl|WHM stations|Lanjiang Road}}
| {{large|{{lang|zh-cn|拦江路}}}}
|
Line 237 ⟶ 235:
|-
|align="center"|●||align="center"|●
|{{stl|WHM stations|Fuxing Road}}
| {{large|{{lang|zh-cn|复兴路}}}}
| {{rint|wuhan|5}}
Line 245 ⟶ 243:
|-
|align="center"|●||align="center"|●
|{{stl|WHM stations|Shouyi Road}}
| {{large|{{lang|zh-cn|首义路}}}}
|
Line 252 ⟶ 250:
|-
|align="center"|●||align="center"|●
|{{stl|WHM stations|Wuchang}}
| {{large|{{lang|zh-cn|武昌火车站}}}}
| {{rint|wuhan|7}} {{RouteBox|WXN|Wuhan-Xianning intercity railway|#{{CR colorrcr|CRH|intercity}}}} {{rint|cn|rail}} {{rint|cn|crh|link=Wuchang railway station}} [[Wuchang railway station|WCN]]
|0.897
|34.264
|-
|align="center"|●||align="center"|●
|{{stl|WHM stations|Meiyuanxiaoqu}}
| {{large|{{lang|zh-cn|梅苑小区}}}}
|
Line 266 ⟶ 264:
|-
|align="center"|●||align="center"|●
|{{stl|WHM stations|Zhongnan Road}}
| {{large|{{lang|zh-cn|中南路}}}}
| {{rint|wuhan|2}}
Line 273 ⟶ 271:
|-
|align="center"|●||align="center"|●
|{{stl|WHM stations|Hongshan Square}}
| {{large|{{lang|zh-cn|洪山广场}}}}
| {{rint|wuhan|2}}
Line 280 ⟶ 278:
|-
|align="center"|●||align="center"|●
|{{stl|WHM stations|Chuhe Hanjie}}
| {{large|{{lang|zh-cn|楚河汉街}}}}
|
Line 287 ⟶ 285:
|-
|align="center"|●||align="center"|●
|{{stl|WHM stations|Qingyuzui}}
| {{large|{{lang|zh-cn|青鱼嘴}}}}
|
Line 294 ⟶ 292:
|-
|align="center"|●||align="center"|●
|{{stl|WHM stations|Dongting}}
| {{large|{{lang|zh-cn|东亭}}}}
|
Line 301 ⟶ 299:
|-
|align="center"|●||align="center"|●
|{{stl|WHM stations|Yuejiazui}}
| {{large|{{lang|zh-cn|岳家嘴}}}}
| {{rint|wuhan|8}}
Line 309 ⟶ 307:
|-
|align="center"|●||align="center"|●
|{{stl|WHM stations|Tieji Road}}
| {{large|{{lang|zh-cn|铁机路}}}}
|
Line 317 ⟶ 315:
|-
|align="center"|●||align="center"|●
|{{stl|WHM stations|Luojiagang}}
| {{large|{{lang|zh-cn|罗家港}}}}
|
Line 324 ⟶ 322:
|-
|align="center"|●||align="center"|●
|{{stl|WHM stations|Yuanlin Road}}
| {{large|{{lang|zh-cn|园林路}}}}
| <!-- {{rint|wuhan|21}} -->
Line 331 ⟶ 329:
|-
|align="center"|●||align="center"|●
|{{stl|WHM stations|Renhe Road}}
| {{large|{{lang|zh-cn|仁和路}}}}
|
Line 338 ⟶ 336:
|-
|align="center"|●||align="center"|●
|{{stl|WHM stations|Gongye 4th Road}}
| {{large|{{lang|zh-cn|工业四路}}}}
|
Line 345 ⟶ 343:
|-
|align="center"|●||align="center"|●
|{{stl|WHM stations|Yangchunhu}}
| {{large|{{lang|zh-cn|杨春湖}}}}
|
Line 352 ⟶ 350:
|-
|align="center"|●||align="center"|●
|{{stl|WHM stations|Wuhan}}
| {{large|{{lang|zh-cn|武汉火车站}}}}
| {{rint|wuhan|5}}{{efn|name=transfer5|Out of system transfer at {{stn|East Square of Wuhan Railway Station}}}} {{rint|wuhan|19}}{{efn|name=transfer19|Out of system transfer. at {{stn|West Square of Wuhan Railway Station}}}} {{RouteBox|WS|Wuhan-Huangshi intercity railway|#{{CR colorrcr|CRH|intercity}}}} {{RouteBox|WG|Wuhan-Huanggang intercity railway|#{{CR colorrcr|CRH|intercity}}}} {{nowrap|{{rint|cn|crh|link=Wuhan railway station}} {{rint|cn|rail}} [[Wuhan railway station|WHN]]}}
|0.810
|49.693
|- style = "background:#{{rcr|WHM color|4}}; height: 2pt"
| colspan="8" |
|}
Line 378 ⟶ 376:
|24
|Tc+M+M+M+M+Tc
|<ref>{{Cite web|title=招标/资格预审公告 - 武汉市轨道交通四号线二期工程车辆系统采购项目|url=https://www.whzbtb.com/V2PRTS/TendererNoticeInfoDetail.do?%69%64=%34%32%30%31%30%36%32%30%30%39%31%30%32%31%30%30%37%31%32%31%31}}</ref>
|-
|'''Type B'''
Line 386 ⟶ 384:
|<ref>{{Cite web|title=招标/资格预审公告 - 武汉市轨道交通蔡甸线工程车辆系统采购项目|url=https://www.whzbtb.com/V2PRTS/TendererNoticeInfoDetail.do?%69%64=%32%30%31%37%30%35%32%32%31%35%30%38%32%36%30%32%38%34}}</ref>
|}
The rolling stock for Line 4 is a 6-car train, with {{convert|100|km/h|0|abbr=on}} of max speed, {{convert|80|km/h|0|abbr=on}} of operation max speed, and {{convert|36.6|km/h|abbr=on}} average speed. The collection shoe is on the lower part of the vehicle. The third rail is a mix of steel and aluminum. A full train provides 176 seats, and can carry 1276 passengers by Chinese regulation of 9 people per square meter.<ref name="whdtkg20110820">{{cite web| publisher ={{lang|zh-hans|荆楚网}} | script-title =zh:武汉4亿元购买地铁4号线列车| url =http://hbrb.cnhubei.com/html/hbrb/20110819/hbrb1476084.html| archive-url =https://web.archive.org/web/20131214105926/http://hbrb.cnhubei.com/html/hbrb/20110819/hbrb1476084.html| url-status =dead| archive-date =2013-12-14| author =Yan Yuntao ({{lang|zh-hans|严运涛}}) | date =2011-08-19| access-date =2011-08-20| language =zh}}</ref><ref name="whdtkg20110819">{{cite web | publisher = [[Xinhua News]] | script-title = zh:武汉4亿元采购90列车 装备地铁4号线 | url = http://news.cnhan.com/content/2011-08/19/content_1317958.htm | author = Wang Tianming ({{lang|zh|汪天明}}) | date = 2011-08-19 | access-date = 2011-08-20 | language = zh | title = Archived copy | archive-url = https://web.archive.org/web/20170908202533/http://news.cnhan.com/content/2011-08/19/content_1317958.htm | archive-date = 2017-09-08 | url-status = dead }}</ref>
 
== See also ==