Overhead line: Difference between revisions

Content deleted Content added
m v2.05b - Bot T20 CW#61 - Fix errors for CW project (Reference before punctuation - Title linked in text)
→‎Australia: No longer three (Glen Huntly is being removed this winter), but if I change it to "two", this won't reflect the source properly
Line 126:
In [[Melbourne]], Victoria, tram drivers put the controller into neutral and coast through section insulators, indicated by insulator markings between the rails.
 
Melbourne has three [[level crossing]]s between electrified suburban railways and tram lines. They have mechanical switching arrangements (changeover switch) to switch the 1500 V DC overhead of the railway and the 650 V DC of the trams, called a Tram Square.<ref>[https://web.archive.org/web/20071208021201/http://www.tmsv.org.au/papers/lvlcross.htm TMSV: Tramway level crossings in Victoria]</ref> Proposals have been advanced to [[Level Crossing Removal Project|grade separate these crossings]] or divert the tram routes.
 
=== Greece ===