Baku–Tbilisi–Kars railway: Difference between revisions

Content deleted Content added
→‎Passengers: corrected date
Tags: Mobile edit Mobile web edit Advanced mobile edit
Line 84:
In total, {{convert|105|km}} of new track have been built between [[Kars]] and [[Akhalkalaki]], with {{convert|76|km}} within Turkey and {{convert|29|km}} in Georgia. The existing railway line from Akhalkalaki to Marabda and on to [[Tbilisi]] and [[Baku]] has been modernised.<ref name="rgi"/>
 
Its total length is {{convert|826|km}}, and the line will be able to transport 1 million passengers and 6.5 million tons of freight in the first stage. ItIts capacity will eventually be 3 million passengers and over 15 million tons of freight.<ref name="cria" />
 
== Gauge ==