Jump to content

Burimari–Lalmonirhat–Parbatipur line: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
Werieth (talk | contribs)
m missing non-free use rationale's for this article using AWB
Tags: Mobile edit Mobile web edit Advanced mobile edit
 
(36 intermediate revisions by 23 users not shown)
Line 1: Line 1:
{{Short description|Railway line in Bangladesh}}
{{Use dmy dates|date=September 2012}}
{{Use dmy dates|date=February 2021}}
{{Infobox rail line
{{Infobox rail line
| box_width = 28em
| box_width = 28em
Line 6: Line 7:
| logo =
| logo =
| logo_width = 150 px
| logo_width = 150 px
| image =
| image = Burimari railway station.jpg
| image_width =
| image_width =
| caption =
| caption = Burimari railway station
| type =
| type =
| system =
| system =
Line 17: Line 18:
| stations = 23
| stations = 23
| routes =
| routes =
| ridership =
| open = 1878
| open = 1878
| close =
| close =
| owner = [[Bangladesh Railway]]
| owner = [[Bangladesh Railway]]
Line 25: Line 25:
| depot =
| depot =
| stock =
| stock =
| linelength =
| linelength ={{convert|163.4|km}}
| tracklength =
| tracklength =
| gauge = {{RailGauge|1000mm|allk=on}}&{{RailGauge|1676mm|allk=on}}
| notrack =
| gauge = {{RailGauge|1000|al=on|allk=on}}
| ogauge =
| minradius =
| racksystem =
| racksystem =
| el =
| speed = ?
| elevation =
| elevation =
| website =
| website =
| map =
| map = {{Burimari-Lalmonirhat-Parbatipur line|collapse=y}}
| map_state =
| map_state =
}}
}}
The '''Burimari–Lalmonirhat–Parbatipur line''' is a {{convert|163.4|km}} long railway line connecting [[Burimari]] and [[Parbatipur Junction]] in northern [[Bangladesh]]. It also connects to [[Kurigram Sadar Upazila|Kurigram]] and Ramna Bazar. This track is under the jurisdiction of [[Bangladesh Railway]].
{{Burimari-Lalmonirhat-Parbatipur line|collapse=y}}

The '''Burimari–Lalmonirhat–Parbatipur line''' is a railway line connecting [[Burimari]] and [[Parbatipur Junction]] in northern [[Bangladesh]]. It also connects to [[Kurigram Sadar Upazila|Kurigram]] and Ramna Bazar. This track is under the jurisdiction of [[Bangladesh Railway]].


==History==
==History==
Once Parbatipur came up as a railway station on the [[Chilahati-Parbatipur-Santahar-Darshana Line]] in 1876, it became a centre of further railway development. There were two developments, one eastward and the other westward. North Bengal State Railway opened a metre gauge line to Kaunia in 1879. Two narrow gauge lines were laid by Eastern Bengal Railway from Kaunia to Dharla River, thereby creating the [[Kaunia–Dharlla State Railway]]. The Kaunia Dharla railway lines were converted to metre gauge in 1901. The Kaunia–Dharla line was extended to Amingaon in 1908. The Assam Behar State Railway started building westward in 1884 and by 1889, Parbatipur was connected with [[Katihar]] in Bihar.<ref name=timeline>{{cite web |url=http://irse.bravehost.com/IRHTML.htm |title=Indian Railway History timeline |author=R.P. Saxena |accessdate=2012-02-01 }}</ref>
Once Parbatipur came up as a railway station on the [[Chilahati-Parbatipur-Santahar-Darshana Line]] in 1876, it became a centre of further railway development. There were two developments, one eastward and the other westward. North Bengal State Railway opened a metre gauge line to Kaunia in 1879. Two narrow gauge lines were laid by Eastern Bengal Railway from Kaunia to Dharla River, thereby creating the [[Kaunia–Dharlla State Railway]]. The Kaunia Dharla railway lines were converted to metre gauge in 1901. The Kaunia–Dharla line was extended to Amingaon in 1908. The Assam Behar State Railway started building westward in 1884 and by 1889, Parbatipur was connected with [[Katihar]] in Bihar.<ref name=timeline>{{cite web |url=http://irse.bravehost.com/IRHTML.htm |title=Indian Railway History timeline |author=R.P. Saxena |url-status=dead |archive-url=https://archive.today/20120714085533/http://irse.bravehost.com/IRHTML.htm |archive-date=14 July 2012 |access-date=2012-02-01}}</ref>


By the turn of the century [[Lalmonirhat Junction]] had emerged as an important railway centre. [[Bengal Dooars Railway]] constructed a line to Malbazar. Cooch Behar State Railway constructed the [[Geetaldaha]]-Jayanti narrow gauge line. Links were established with Assam, with the Golokganj–Amingaon line coming up.<ref name=timeline/>
By the turn of the century [[Lalmonirhat Junction]] had emerged as an important railway centre. [[Bengal Dooars Railway]] constructed a line to Malbazar. Cooch Behar State Railway constructed the [[Geetaldaha]]-Jayanti narrow gauge line. Links were established with Assam, with the Golokganj–Amingaon line coming up.<ref name=timeline/>


==Assam links==
==Assam links==
There were two Assam links through this area, before the [[Partition of India]].
There were two Assam links through this area, before the [[Partition of India]].


The first and more important one was through [[Mogalhat]]–[[Geetaldaha]]–Bamanhat–[[Golokganj]]. Even when railway links were restored between Pakistan and India in 1955, the line was in order and was one of the agreed transit points.<ref name=agreement>{{cite web| url = http://www.commonlii.org/in/other/treaties/INTSer/1955/4.html|title = Agreement between the Government of Pakistan and Government of India regarding Resumption of Rail Traffic (1955)| accessdate = 2012-02-01 }}</ref> The railway bridge across the Dharla River was subsequently partially washed out and the railway link was snapped.
The first and more important one was through [[Mogalhat]]–[[Geetaldaha]]–[[Coochbehar]]–[[Golokganj]]. Even when railway links were restored between Pakistan and India in 1955, the line was in order and was one of the agreed transit points.<ref name=agreement>{{cite web| url = http://www.commonlii.org/in/other/treaties/INTSer/1955/4.html|title = Agreement between the Government of Pakistan and Government of India regarding Resumption of Rail Traffic (1955)| access-date = 2012-02-01 }}</ref> The railway bridge across the Dharla River was subsequently partially washed out and the railway link was snapped.


The second link through Kurigram and Sonahat was snapped earlier with a bridge being washed away within what is now Bangladesh. In 1955, the link was not there.<ref name=agreement/><ref>{{cite web| url = http://www.hindu.com/2008/02/06/stories/2008020652601400.htm |title = Fencing on Indo-Bangla border in full swing in Assam | accessdate = 2012-02-01 }}</ref>
The second link through [[Geetaldaha]]-Bamanhat-[[Golokganj]] was snapped earlier with a bridge being washed away within what is now Bangladesh. In 1955, the link was not there.<ref name=agreement/><ref>{{cite news| url = http://www.hindu.com/2008/02/06/stories/2008020652601400.htm | archive-url = https://web.archive.org/web/20080208215605/http://www.hindu.com/2008/02/06/stories/2008020652601400.htm | url-status = dead | archive-date = 8 February 2008 |title = Fencing on Indo-Bangla border in full swing in Assam | location=Chennai, India | date=6 February 2008 | work = [[The Hindu]] | access-date = 2012-02-01}}</ref>


==Defunct rail transit point==
==Defunct rail transit point==
The [[Burimari]]–[[Changrabandha]] rail transit point has become functional. The Indian side of the line is now made BG and is operational between [[New Mal Junction]] to [[Changrabandha railway station|Changrabandha]]. New line has been made to connect [[New Cooch Behar Junction railway station|New Cooch Behar]] from Changrabandha.<ref>{{cite web| url = http://www.irfca.org/docs/international-links.html |title = International Links from India |last= Mohan Bhuyan| publisher=IRFCA | access-date = 2011-12-10}}</ref>
The [[Burimari]]–[[Changrabandha]] rail transit point has become defunct.


But the other side was Dual gauge line is fully constructed to Lalmonirhat in 2012. Now there running 8 trains daily to different City. Total nine station of this section are remodeled.<ref>{{cite news| url = http://www.thedailystar.net/newDesign/news-details.php?nid=74750 |title = Lalmonirhat-burimari Route −45 trains derail in 5 months – Lack of sleepers, stone makes the run-down track risky. | work= The Daily Star, 7 February 2009| access-date = 2011-12-10 }}</ref><ref>{{cite news| url = http://www.thefinancialexpress-bd.com/2009/08/10/75691.html |title = For better railway between Lalmonirhat and Burimari| work= The Financial Express |date=10 August 2009| access-date = 2011-12-10 }}</ref> Bangladesh now making the whole section DG to revive this route. A bridge in River Dharla is being constructed for this.<ref>{{cite news | url = http://news.priyo.com/business/2011/09/11/tk-14531-crore-br-projects-dou-36948.html | title = Tk 14,531 crore BR projects to double capacity | work = Priyo.com | access-date = 2011-12-10 | archive-url = https://web.archive.org/web/20120406181312/http://news.priyo.com/business/2011/09/11/tk-14531-crore-br-projects-dou-36948.html | archive-date = 6 April 2012 | url-status = dead }}</ref>
The Indian side of the line is now out of service.<ref>{{cite web| url = http://www.irfca.org/docs/international-links.html |title = International Links from India |last= Mohan Bhuyan| publisher=IRFCA | accessdate = 2011-12-10 }}</ref>

The Bangladeshi side of the line is still functional but the track is in bad shape with frequent derailments. There are two local trains in a day running at a limited speed of 8–14&nbsp;km per hour (as against 45&nbsp;km per hour in normal sections).<ref>{{cite web| url = http://www.thedailystar.net/newDesign/news-details.php?nid=74750 |title = Lalmonirhat-burimari Route −45 trains derail in 5 months – Lack of sleepers, stone makes the run-down track risky | publisher= The Daily Star, 7 February 2009| accessdate = 2011-12-10 }}</ref><ref>{{cite web| url = http://www.thefinancialexpress-bd.com/2009/08/10/75691.html |title = For better railway between Lalmonirhat and Burimari| publisher= The Financial Express, 10 August 2009| accessdate = 2011-12-10 }}</ref> Bangladesh Railway has planned for rehabilitation of the line.<ref>{{cite web| url = http://news.priyo.com/business/2011/09/11/tk-14531-crore-br-projects-dou-36948.html |title = Tk 14,531 crore BR projects to double capacity | publisher=Priyo Internet Life | accessdate = 2011-12-10 }}</ref>


==References==
==References==
Line 67: Line 58:
{{Railways in Bangladesh}}
{{Railways in Bangladesh}}


{{DEFAULTSORT:Burimari-Lalmonirhat-Parbatipur line}}
[[Category:Railway lines in Bangladesh]]

[[Category:Transport in Rangpur, Bangladesh]]
[[Category:Parbatipur Upazila]]
[[Category:Metre gauge railways in Bangladesh]]
[[Category:1878 establishments in British India]]

Latest revision as of 03:15, 17 May 2024

Burimari–Lalmonirhat–Parbatipur line
Burimari railway station
Overview
StatusOperational
OwnerBangladesh Railway
LocaleBangladesh
Termini
Stations23
History
Opened1878
Technical
Line length163.4 kilometres (101.5 mi)
Track gauge1,000 mm (3 ft 3+38 in) metre gauge&1,676 mm (5 ft 6 in)
Route map

The Burimari–Lalmonirhat–Parbatipur line is a 163.4 kilometres (101.5 mi) long railway line connecting Burimari and Parbatipur Junction in northern Bangladesh. It also connects to Kurigram and Ramna Bazar. This track is under the jurisdiction of Bangladesh Railway.

History

[edit]

Once Parbatipur came up as a railway station on the Chilahati-Parbatipur-Santahar-Darshana Line in 1876, it became a centre of further railway development. There were two developments, one eastward and the other westward. North Bengal State Railway opened a metre gauge line to Kaunia in 1879. Two narrow gauge lines were laid by Eastern Bengal Railway from Kaunia to Dharla River, thereby creating the Kaunia–Dharlla State Railway. The Kaunia Dharla railway lines were converted to metre gauge in 1901. The Kaunia–Dharla line was extended to Amingaon in 1908. The Assam Behar State Railway started building westward in 1884 and by 1889, Parbatipur was connected with Katihar in Bihar.[1]

By the turn of the century Lalmonirhat Junction had emerged as an important railway centre. Bengal Dooars Railway constructed a line to Malbazar. Cooch Behar State Railway constructed the Geetaldaha-Jayanti narrow gauge line. Links were established with Assam, with the Golokganj–Amingaon line coming up.[1]

[edit]

There were two Assam links through this area, before the Partition of India.

The first and more important one was through MogalhatGeetaldahaCoochbeharGolokganj. Even when railway links were restored between Pakistan and India in 1955, the line was in order and was one of the agreed transit points.[2] The railway bridge across the Dharla River was subsequently partially washed out and the railway link was snapped.

The second link through Geetaldaha-Bamanhat-Golokganj was snapped earlier with a bridge being washed away within what is now Bangladesh. In 1955, the link was not there.[2][3]

Defunct rail transit point

[edit]

The BurimariChangrabandha rail transit point has become functional. The Indian side of the line is now made BG and is operational between New Mal Junction to Changrabandha. New line has been made to connect New Cooch Behar from Changrabandha.[4]

But the other side was Dual gauge line is fully constructed to Lalmonirhat in 2012. Now there running 8 trains daily to different City. Total nine station of this section are remodeled.[5][6] Bangladesh now making the whole section DG to revive this route. A bridge in River Dharla is being constructed for this.[7]

References

[edit]
  1. ^ a b R.P. Saxena. "Indian Railway History timeline". Archived from the original on 14 July 2012. Retrieved 1 February 2012.
  2. ^ a b "Agreement between the Government of Pakistan and Government of India regarding Resumption of Rail Traffic (1955)". Retrieved 1 February 2012.
  3. ^ "Fencing on Indo-Bangla border in full swing in Assam". The Hindu. Chennai, India. 6 February 2008. Archived from the original on 8 February 2008. Retrieved 1 February 2012.
  4. ^ Mohan Bhuyan. "International Links from India". IRFCA. Retrieved 10 December 2011.
  5. ^ "Lalmonirhat-burimari Route −45 trains derail in 5 months – Lack of sleepers, stone makes the run-down track risky". The Daily Star, 7 February 2009. Retrieved 10 December 2011.
  6. ^ "For better railway between Lalmonirhat and Burimari". The Financial Express. 10 August 2009. Retrieved 10 December 2011.
  7. ^ "Tk 14,531 crore BR projects to double capacity". Priyo.com. Archived from the original on 6 April 2012. Retrieved 10 December 2011.