Jump to content

Dunbar railway station: Difference between revisions

Coordinates: 55°59′55″N 2°30′52″W / 55.9985°N 2.5145°W / 55.9985; -2.5145
From Wikipedia, the free encyclopedia
Content deleted Content added
No edit summary
(19 intermediate revisions by 10 users not shown)
Line 17: Line 17:
| manager = [[ScotRail]]
| manager = [[ScotRail]]
| platforms = 2
| platforms = 2
| tracks = 3
| code = DUN
| code = DUN
| original = [[North British Railway]]
| original = [[North British Railway]]
Line 22: Line 23:
| postgroup = [[London and North Eastern Railway|LNER]]
| postgroup = [[London and North Eastern Railway|LNER]]
| years = 16 June 1846
| years = 16 June 1846
| events = Opened<ref name="butt">Butt (1995)</ref><ref name="railscot">RAILSCOT</ref>
| events = Opened<ref name="butt">Butt (1995)</ref>
| mpassengers =
| mpassengers =
{{Rail pass box |pass_year=2017/18 |passengers={{increase}} 0.460 million}}
{{Rail pass box |pass_year=2018/19 |passengers={{increase}} 0.478 million}}
{{Rail pass box |pass_year=2018/19 |passengers={{increase}} 0.478 million}}
{{Rail pass box |pass_year=2019/20 |passengers={{decrease}} 0.474 million}}
{{Rail pass box |pass_year=2019/20 |passengers={{decrease}} 0.474 million}}
{{Rail pass box |pass_year=2020/21 |passengers={{decrease}} 66,300}}
{{Rail pass box |pass_year=2020/21 |passengers={{decrease}} 66,300}}
{{Rail pass box |pass_year=2021/22 |passengers={{increase}} 0.252 million}}
{{Rail pass box |pass_year=2021/22 |passengers={{increase}} 0.252 million}}
{{Rail pass box |pass_year=2022/23 |passengers={{increase}} 0.319 million}}
| footnotes = Passenger statistics from the [[Office of Rail and Road]]
| footnotes = Passenger statistics from the [[Office of Rail and Road]]
| embedded = {{Infobox designation list|embed=yes
| embedded = {{Infobox designation list|embed=yes
Line 41: Line 42:


==History==
==History==
{{Unsourced section|date=May 2024}}

The station, which was first opened by the [[North British Railway]] in June 1846, used to have two platforms and an overall roof.<ref name="railscot"/> The northbound platform loop line was taken out of use and lifted in the early 1970s, whilst the platform itself and the station roof were both removed during the modernisation and [[Railway electrification in Great Britain|electrification]] by [[British Rail]] of the northern end of the [[East Coast Main Line]] in 1987–88.
The station, which was first opened by the [[North British Railway]] in June 1846, used to have two platforms and an overall roof. The northbound platform loop line was taken out of use and lifted in the early 1970s, whilst the platform itself and the station roof were both removed during the modernisation and [[Railway electrification in Great Britain|electrification]] by [[British Rail]] of the northern end of the [[East Coast Main Line]] in 1987–88.


For approximately five months in 1979, this was the terminal station for a shuttle service to Edinburgh Waverley. The shuttle service was provided after the East Coast Main Line was blocked due to the collapse of [[Penmanshiel Tunnel]]. Buses linked Dunbar with [[Berwick-upon-Tweed railway station|Berwick-upon-Tweed]], from where rail services to [[London King's Cross railway station|London King's Cross]] resumed.
For approximately five months in 1979, this was the terminal station for a shuttle service to Edinburgh Waverley. The shuttle service was provided after the East Coast Main Line was blocked due to the collapse of [[Penmanshiel Tunnel]]. Buses linked Dunbar with [[Berwick-upon-Tweed railway station|Berwick-upon-Tweed]], from where rail services to [[London King's Cross railway station|London King's Cross]] resumed.
Line 49: Line 50:
The main platform (One) is located on a loop adjacent to the main through lines. The second platform is on the main northbound line which has had trains stopping there since 15 December 2019.
The main platform (One) is located on a loop adjacent to the main through lines. The second platform is on the main northbound line which has had trains stopping there since 15 December 2019.


Prior to December 2019, the line on which the main platform is located was bi-directional (meaning that trains travelling to/from London or Edinburgh Waverley had to take it in turns to use the station if they were scheduled to stop there). Preliminary work into a new second platform began in October 2015.<ref>[http://www.eastlothiancourier.com/news/dunbar/14411480.Station_could_get_second_platform_in_three_years/ Dunbar Railway Station could get second platform in three years] {{Webarchive|url=https://web.archive.org/web/20170211075011/http://www.eastlothiancourier.com/news/dunbar/14411480.Station_could_get_second_platform_in_three_years/ |date=11 February 2017 }} ''East Lothian Courier'' news article 8 April 2016; Retrieved 9 February 2017</ref> In December 2018, Network Rail announced (via press release) that Amco had been appointed the contractors for the construction of the second platform, which would start in Summer 2019 and was intended to have the works completed by early 2020. Construction of the new platform necessitated a new footbridge with lifts, and improvements to the station carpark were carried out as part of the project. The bridge was completed ahead of schedule and the new platform opened in December 2019.<ref>{{cite press release |url=https://www.networkrailmediacentre.co.uk/news/amco-awarded-dunbar-station-upgrade-contract |title=Amco awarded Dunbar railway station upgrade contract |publisher=Network Rail |date=12 December 2018 |access-date=14 December 2018 |archive-url=https://web.archive.org/web/20181214164037/https://www.networkrailmediacentre.co.uk/news/amco-awarded-dunbar-station-upgrade-contract |archive-date=14 December 2018 |url-status=live |df=dmy-all }}</ref><ref>{{cite web|url=https://www.eastlothiancourier.com/news/18124883.second-platform-dunbar-railway-station-officially-opened/|title=Second Platform at Dunbar station opened|date=30 December 2019|access-date=15 March 2020|archive-date=26 February 2020|archive-url=https://web.archive.org/web/20200226183229/https://www.eastlothiancourier.com/news/18124883.second-platform-dunbar-railway-station-officially-opened/|url-status=live}}</ref> Final fitting work and completion of the carpark continued, however it was delayed due to the coronavirus pandemic.<ref>{{Cite web|last=Smith|first=Claire|date=2020-07-03|title=Covid-19 {{!}} Network Rail restarts major projects in Scotland|url=https://www.newcivilengineer.com/latest/covid-19-network-rail-restarts-major-projects-in-scotland-03-07-2020/|access-date=2020-07-28|website=New Civil Engineer|language=en|archive-date=28 July 2020|archive-url=https://web.archive.org/web/20200728113029/https://www.newcivilengineer.com/latest/covid-19-network-rail-restarts-major-projects-in-scotland-03-07-2020/|url-status=live}}</ref>
Prior to December 2019, the line on which the main platform is located was bi-directional (meaning that trains travelling to/from London or Edinburgh Waverley had to take it in turns to use the station if they were scheduled to stop there). Preliminary work into a new second platform began in October 2015.<ref>[http://www.eastlothiancourier.com/news/dunbar/14411480.Station_could_get_second_platform_in_three_years/ Dunbar Railway Station could get second platform in three years] {{Webarchive|url=https://web.archive.org/web/20170211075011/http://www.eastlothiancourier.com/news/dunbar/14411480.Station_could_get_second_platform_in_three_years/ |date=11 February 2017 }} ''East Lothian Courier'' news article 8 April 2016; Retrieved 9 February 2017</ref> In December 2018, Network Rail announced (via press release) that Amco had been appointed the contractors for the construction of the second platform, which would start in Summer 2019 and was intended to have the works completed by early 2020. Construction of the new platform necessitated a new footbridge with lifts, and improvements to the station carpark were carried out as part of the project. The bridge was completed ahead of schedule and the new platform opened in December 2019.<ref>{{cite press release |url=https://www.networkrailmediacentre.co.uk/news/amco-awarded-dunbar-station-upgrade-contract |title=Amco awarded Dunbar railway station upgrade contract |publisher=Network Rail |date=12 December 2018 |access-date=14 December 2018 |archive-url=https://web.archive.org/web/20181214164037/https://www.networkrailmediacentre.co.uk/news/amco-awarded-dunbar-station-upgrade-contract |archive-date=14 December 2018 |url-status=live |df=dmy-all }}</ref><ref>{{cite web|url=https://www.eastlothiancourier.com/news/18124883.second-platform-dunbar-railway-station-officially-opened/|title=Second Platform at Dunbar station opened|date=30 December 2019|access-date=15 March 2020|archive-date=26 February 2020|archive-url=https://web.archive.org/web/20200226183229/https://www.eastlothiancourier.com/news/18124883.second-platform-dunbar-railway-station-officially-opened/|url-status=live}}</ref> Final fitting work and completion of the carpark continued, however it was delayed due to the coronavirus pandemic.<ref>{{Cite magazine|last=Smith|first=Claire|date=2020-07-03|title=Covid-19 {{!}} Network Rail restarts major projects in Scotland|url=https://www.newcivilengineer.com/latest/covid-19-network-rail-restarts-major-projects-in-scotland-03-07-2020/|access-date=2020-07-28|magazine=New Civil Engineer|language=en|archive-date=28 July 2020|archive-url=https://web.archive.org/web/20200728113029/https://www.newcivilengineer.com/latest/covid-19-network-rail-restarts-major-projects-in-scotland-03-07-2020/|url-status=live}}</ref>


With all Northbound services now using the second platform and no longer using the main platform loop (with the exception of all terminating Scotrail Services from Edinburgh), this now leaves [[Syston railway station|Syston station in Leicester]] as the only rare example of a single platformed main line railway station used on a major route.
With all Northbound services now using the second platform and no longer using the main platform loop (with the exception of all terminating Scotrail Services from Edinburgh), this now leaves [[Syston railway station|Syston station in Leicester]] as the only rare example of a single platformed main line railway station used on a major route.
Line 61: Line 62:
There are two platforms. The station entrance is to the east, adjacent to the southbound platform. The northbound platform, reinstated in 2019, is accessible via a footbridge with lifts.
There are two platforms. The station entrance is to the east, adjacent to the southbound platform. The northbound platform, reinstated in 2019, is accessible via a footbridge with lifts.
==Services==
==Services==
The station is served by [[ScotRail]], [[CrossCountry]], [[London North Eastern Railway]] and [[TransPennine Express]]. It was managed by the [[InterCity East Coast]] franchise holder until June 2015 when responsibility was transferred from [[Virgin Trains East Coast]] to [[Abellio ScotRail]].<ref>Regional News ''[[Rail (magazine)|Rail]]'' issue 788 25 November 2015 page 27</ref><ref>[http://www.transportscotland.gov.uk/system/files/uploaded_content/documents/tsc_basic_pages/Rail/ScotRail%20franchise/scotrail-franchise-itt-4855286-45.pdf ScotRail Franchise Invitation to Tender] {{webarchive|url=https://web.archive.org/web/20141013212842/http://www.transportscotland.gov.uk/system/files/uploaded_content/documents/tsc_basic_pages/Rail/ScotRail%20franchise/scotrail-franchise-itt-4855286-45.pdf |date=13 October 2014 }} Transport Scotland 23 January 2014</ref><ref>{{Cite web |url=http://www.virgintrainseastcoast.com/globalassets/downloads/pdf/passengerscharter-march2015.pdf |title=Archived copy |access-date=1 March 2015 |archive-date=1 April 2015 |archive-url=https://web.archive.org/web/20150401052524/http://www.virgintrainseastcoast.com/globalassets/downloads/pdf/passengerscharter-march2015.pdf |url-status=live }}</ref>
The station is served by [[ScotRail]], [[CrossCountry]], [[London North Eastern Railway]] and [[TransPennine Express]]. It was managed by the [[InterCity East Coast]] franchise holder until June 2015 when responsibility was transferred from [[Virgin Trains East Coast]] to [[Abellio ScotRail]].<ref>{{cite magazine|title=Regional News | magazine=[[Rail Magazine]] |issue=788|date=25 November 2015|page=27}}</ref><ref>[http://www.transportscotland.gov.uk/system/files/uploaded_content/documents/tsc_basic_pages/Rail/ScotRail%20franchise/scotrail-franchise-itt-4855286-45.pdf ScotRail Franchise Invitation to Tender] {{webarchive|url=https://web.archive.org/web/20141013212842/http://www.transportscotland.gov.uk/system/files/uploaded_content/documents/tsc_basic_pages/Rail/ScotRail%20franchise/scotrail-franchise-itt-4855286-45.pdf |date=13 October 2014 }} Transport Scotland 23 January 2014</ref><ref>{{Cite web |url=http://www.virgintrainseastcoast.com/globalassets/downloads/pdf/passengerscharter-march2015.pdf |title=Archived copy |access-date=1 March 2015 |archive-date=1 April 2015 |archive-url=https://web.archive.org/web/20150401052524/http://www.virgintrainseastcoast.com/globalassets/downloads/pdf/passengerscharter-march2015.pdf |url-status=usurped }}</ref>


The daytime service at Dunbar is as follows:
The daytime service at Dunbar is as follows:


===ScotRail===
===ScotRail===
ScotRail run a service to/from Edinburgh Waverley every two hours which starts and terminates here which call at [[Musselburgh railway station|Musselburgh]] and Edinburgh Waverley. These services do not operate on Sundays.
ScotRail run a service to/from Edinburgh Waverley every two hours which starts and terminates here which call at [[East Linton railway station|East Linton]], [[Wallyford railway station|Wallyford]], [[Musselburgh railway station|Musselburgh]] and Edinburgh Waverley. These services do not operate on Sundays.


===LNER===
===LNER===
Line 74: Line 75:


===TransPennine Express===
===TransPennine Express===
TransPennine Express provide the following service, There are five southbound trains per day to Newcastle plus an extra two trains which terminate at Berwick. Northbound, there are seven trains per day to Edinburgh
TransPennine Express provide the following service, There are five southbound trains per day to Newcastle plus an extra two trains which terminate at Berwick. Northbound, there are seven trains per day to Edinburgh(Six on Saturdays)


===CrossCountry===
===CrossCountry===
Line 84: Line 85:
|next = {{Stnlnk|Edinburgh Waverley}}
|next = {{Stnlnk|Edinburgh Waverley}}
|route = CrossCountry<br />[[CrossCountry#Core|(Cross Country Route)]]<br>(East Coast Main Line)
|route = CrossCountry<br />[[CrossCountry#Core|(Cross Country Route)]]<br>(East Coast Main Line)
|col = {{XC colour}} }}
|col = {{XC colour}}}}
{{rail line
{{rail line
|previous = {{Stnlnk|Reston}}<br />or {{Stnlnk|Berwick-upon-Tweed}}<br />or {{Stnlnk|Alnmouth}}
|previous = {{Stnlnk|Reston}}<br />or {{Stnlnk|Berwick-upon-Tweed}}<br />or {{Stnlnk|Alnmouth}}
Line 96: Line 97:
|col = {{TPX colour}}}}
|col = {{TPX colour}}}}
{{rail line
{{rail line
|next = {{Stnlnk|East Linton}}
|next = {{Stnlnk|East Linton }}
|route = [[ScotRail#Services|ScotRail]]<br />[[North Berwick Line|Edinburgh to Dunbar]]<br>([[East Coast Main Line]])
|route = [[ScotRail#Services|ScotRail]]<br />[[North Berwick Line|Edinburgh to Dunbar]]<br>([[East Coast Main Line]])
|col={{ScotRail colour}} |lightcol={{National Rail colour|ScotRail|branch=North Berwick Line}} }}
|col={{ScotRail colour}} |lightcol={{National Rail colour|ScotRail|branch=North Berwick Line}} }}
Line 102: Line 103:
{{rail line
{{rail line
|previous = {{Stnlnk|Innerwick}}<br />''Line open; station closed''
|previous = {{Stnlnk|Innerwick}}<br />''Line open; station closed''
|next = {{Stnlnk|East Linton}}<br />''Line open; station closed''
|next = {{Stnlnk|East Linton}}<br />''Line and station open (resited)''
|route = [[North British Railway]]<br />[[North British Railway Main Line|NBR Main Line]]
|route = [[North British Railway]]<br />[[North British Railway Main Line|NBR Main Line]]
|col = {{NBR colour}} |lightcol={{NBR light}} }}
|col = {{NBR colour}} |lightcol={{NBR light}}}}
{{s-end}}
{{s-end}}
{{Future rail start}}
{{rail line|previous=|next={{rws|East Linton}}|route=[[ScotRail]]<br><small>[[North Berwick Line|Edinburgh to Dunbar]]</small>|col={{ScotRail colour}}}}
{{rail end}}
{{rail end}}



Revision as of 21:47, 27 June 2024

Dunbar

Scottish Gaelic: Dùn Bàrr[1]
National Rail
Looking north from the reinstated second platform at Dunbar in 2020.
General information
StandortDunbar, East Lothian
Scotland
Coordinates55°59′55″N 2°30′52″W / 55.9985°N 2.5145°W / 55.9985; -2.5145
Grid referenceNT680784
Managed byScotRail
Platforms2
Tracks3
Other information
Station codeDUN
History
Original companyNorth British Railway
Pre-groupingNorth British Railway
Post-groupingLNER
Key dates
16 June 1846Opened[2]
Passengers
2018/19Increase 0.478 million
2019/20Decrease 0.474 million
2020/21Decrease 66,300
2021/22Increase 0.252 million
2022/23Increase 0.319 million
Listed Building – Category B
Designated11 January 1988
Reference no.LB24857[3]
Notes
Passenger statistics from the Office of Rail and Road

Dunbar railway station serves the town of Dunbar in East Lothian, Scotland. It is located on the East Coast Main Line and is a two platform station. It is 29 miles 5 chains (46.8 km) from Edinburgh Waverley and 364.092 miles (585.950 km) from London King's Cross.[4]

History

The station, which was first opened by the North British Railway in June 1846, used to have two platforms and an overall roof. The northbound platform loop line was taken out of use and lifted in the early 1970s, whilst the platform itself and the station roof were both removed during the modernisation and electrification by British Rail of the northern end of the East Coast Main Line in 1987–88.

For approximately five months in 1979, this was the terminal station for a shuttle service to Edinburgh Waverley. The shuttle service was provided after the East Coast Main Line was blocked due to the collapse of Penmanshiel Tunnel. Buses linked Dunbar with Berwick-upon-Tweed, from where rail services to London King's Cross resumed.

Platform Layout

The main platform (One) is located on a loop adjacent to the main through lines. The second platform is on the main northbound line which has had trains stopping there since 15 December 2019.

Prior to December 2019, the line on which the main platform is located was bi-directional (meaning that trains travelling to/from London or Edinburgh Waverley had to take it in turns to use the station if they were scheduled to stop there). Preliminary work into a new second platform began in October 2015.[5] In December 2018, Network Rail announced (via press release) that Amco had been appointed the contractors for the construction of the second platform, which would start in Summer 2019 and was intended to have the works completed by early 2020. Construction of the new platform necessitated a new footbridge with lifts, and improvements to the station carpark were carried out as part of the project. The bridge was completed ahead of schedule and the new platform opened in December 2019.[6][7] Final fitting work and completion of the carpark continued, however it was delayed due to the coronavirus pandemic.[8]

With all Northbound services now using the second platform and no longer using the main platform loop (with the exception of all terminating Scotrail Services from Edinburgh), this now leaves Syston station in Leicester as the only rare example of a single platformed main line railway station used on a major route.

Accidents and incidents

  • On 3 January 1898, an express passenger train collided with a freight train that was being shunted. One person was killed and 21 were injured.[9]

Facilities

The station is fully staffed, with the ticket office open throughout the week (Monday - Friday 05:55 - 21:30, Saturday 06:25 - 20:40 and Sunday 11:15 - 21:30). Self-service ticket machines are also provided for use outside these times and for collecting pre-paid tickets. There are toilets, a payphone and vending machines on the concourse. Train running information is provided by manual announcements, digital CIS displays, a customer help point and timetable posters. Level access is available from the entrance and concourse to the platform.[10]

There are two platforms. The station entrance is to the east, adjacent to the southbound platform. The northbound platform, reinstated in 2019, is accessible via a footbridge with lifts.

Services

The station is served by ScotRail, CrossCountry, London North Eastern Railway and TransPennine Express. It was managed by the InterCity East Coast franchise holder until June 2015 when responsibility was transferred from Virgin Trains East Coast to Abellio ScotRail.[11][12][13]

The daytime service at Dunbar is as follows:

ScotRail

ScotRail run a service to/from Edinburgh Waverley every two hours which starts and terminates here which call at East Linton, Wallyford, Musselburgh and Edinburgh Waverley. These services do not operate on Sundays.

LNER

LNER provide a limited service at Dunbar. This is as follows:

On Monday to Thursdays, there are four trains per day south; three of these go to London Kings Cross, while one operates to Leeds. On Fridays there is an extra late night service which terminates at Newcastle. On Saturdays and Sundays, there are two trains per day to London Kings Cross, one to Doncaster and one to Newcastle. There are also four trains per day north to Edinburgh, (five on Sundays).

TransPennine Express

TransPennine Express provide the following service, There are five southbound trains per day to Newcastle plus an extra two trains which terminate at Berwick. Northbound, there are seven trains per day to Edinburgh(Six on Saturdays)

CrossCountry

CrossCountry call at Dunbar three times a day (two on Sundays) to Edinburgh Northbound and Southbound to Plymouth and Birmingham New Street.

Preceding station National Rail National Rail Following station
Berwick-upon-Tweed
or Alnmouth
or Newcastle
  CrossCountry
(Cross Country Route)
(East Coast Main Line)
  Edinburgh Waverley
Reston
or Berwick-upon-Tweed
or Alnmouth
  London North Eastern Railway
(East Coast Main Line)
(London-Edinburgh)
  Edinburgh Waverley
Reston   TransPennine Express
(North Route)
(East Coast Main Line)
  East Linton
Terminus   ScotRail
Edinburgh to Dunbar
(East Coast Main Line)
  East Linton
  Historical railways  
Innerwick
Line open; station closed
  North British Railway
NBR Main Line
  East Linton
Line and station open (resited)

|}

References

  1. ^ Brailsford 2017, Gaelic/English Station Index.
  2. ^ Butt (1995)
  3. ^ "STATION ROAD, DUNBAR RAILWAY STATION AND STATION LODGE". Historic Scotland. Archived from the original on 26 February 2019. Retrieved 25 February 2019.
  4. ^ Yonge, John (December 2007) [1987]. Jacobs, Gerald (ed.). Railway Track Diagrams 1: Scotland & Isle of Man (5th ed.). Bradford on Avon: Trackmaps. map 11B. ISBN 978-0-9549866-3-6.
  5. ^ Dunbar Railway Station could get second platform in three years Archived 11 February 2017 at the Wayback Machine East Lothian Courier news article 8 April 2016; Retrieved 9 February 2017
  6. ^ "Amco awarded Dunbar railway station upgrade contract" (Press release). Network Rail. 12 December 2018. Archived from the original on 14 December 2018. Retrieved 14 December 2018.
  7. ^ "Second Platform at Dunbar station opened". 30 December 2019. Archived from the original on 26 February 2020. Retrieved 15 March 2020.
  8. ^ Smith, Claire (3 July 2020). "Covid-19 | Network Rail restarts major projects in Scotland". New Civil Engineer. Archived from the original on 28 July 2020. Retrieved 28 July 2020.
  9. ^ Trevena, Arthur (1981). Trains in Trouble: Vol. 2. Redruth: Atlantic Books. p. 9. ISBN 0-906899-03-6.
  10. ^ Dunbar station facilities Archived 11 February 2017 at the Wayback Machine National Rail Enquiries
  11. ^ "Regional News". Rail Magazine. No. 788. 25 November 2015. p. 27.
  12. ^ ScotRail Franchise Invitation to Tender Archived 13 October 2014 at the Wayback Machine Transport Scotland 23 January 2014
  13. ^ "Archived copy" (PDF). Archived from the original on 1 April 2015. Retrieved 1 March 2015.{{cite web}}: CS1 maint: archived copy as title (link) CS1 maint: unfit URL (link)

Bibliography