Jump to content

Baku–Supsa Pipeline: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
m the length as per BP website
GreenC bot (talk | contribs)
(42 intermediate revisions by 29 users not shown)
Line 1: Line 1:
{{Short description|Oil pipeline from Azerbaijan to Turkey}}
{{Infobox Pipeline
{{Infobox pipeline
| name = Baku–Supsa Pipeline
| type = oil
| name = Baku–Supsa Pipeline
| photo =
| type = oil
| caption =
| photo =
| map = Baku pipelines.svg
| caption =
| map = Baku pipelines.svg
| map_caption = Location of Baku–Supsa Pipeline
| country = [[Azerbaijan]], [[Georgia (country)|Georgia]], [[Turkey]]
| country = [[Azerbaijan]], [[Georgia (country)|Georgia]], [[Turkey]]
| coordinates =
| operator = [[BP]]
| coordinates =
| partners = [[State Oil Company of Azerbaijan]], [[Azerbaijan International Operating Company]]
| operator = [[BP]]
| partners = [[State Oil Company of Azerbaijan|SOCAR]], [[Azerbaijan International Operating Company]], [[GIOC]]
| length = 833
| length_km = 833
| discharge = {{convert|145000|oilbbl}} per day
| discharge = {{convert|145000|oilbbl}} per day
| direction = east–west
| direction = east–west
| start = [[Baku]] ([[Sangachal Terminal]]), [[Azerbaijan]]
| start = [[Baku]] ([[Sangachal Terminal]]), [[Azerbaijan]]
| finish = [[Supsa]] terminal in [[Georgia (country)|Georgia]]
| finish = [[Supsa]] terminal in [[Georgia (country)|Georgia]]
| est = 1999
| est = 1999
| through = [[Tbilisi]]
| through = [[Tbilisi]]
| par = [[Baku–Tbilisi–Ceyhan pipeline]] (partly)
| par = [[Baku–Tbilisi–Ceyhan pipeline]] (partly)
}}
}}


The '''Baku–Supsa Pipeline''' (also known as the '''Western Route Export Pipeline''' and '''Western Early Oil Pipeline''') is an {{convert|833|km|mi|adj=on}} long oil pipeline, which runs from the [[Sangachal Terminal]] near [[Baku]] to the [[Supsa]] terminal in [[Georgia (country)|Georgia]]. It transports oil from the [[Azeri-Chirag-Guneshli]] field. The pipeline is operated by [[BP]].
The '''Baku–Supsa Pipeline''' (also known as the '''Western Route Export Pipeline''' and '''Western Early Oil Pipeline''') is an {{convert|833|km|mi|adj=on}} long oil pipeline, which runs from the [[Sangachal Terminal]] near [[Baku]] to the [[Supsa]] terminal in [[Georgia (country)|Georgia]]. It transports oil from the [[Azeri-Chirag-Guneshli]] field. The pipeline is operated by [[BP]].<ref>[http://www.bp.com/en_ge/bp-georgia/about-bp/bp-in-georgia/western-route-export-pipeline--wrep-.html BP site]</ref>


==History==
==History==
Line 27: Line 29:
| title = Transport routes of Azerbaijani oil (Baku-Novorossiysk, Baku-Supsa)
| title = Transport routes of Azerbaijani oil (Baku-Novorossiysk, Baku-Supsa)
| publisher = Azerbaijan Portal
| publisher = Azerbaijan Portal
| accessdate = 2008-06-08
| access-date = 2008-06-08
}}</ref> At the same year the lead contract of the project was awarded to [[Kværner]]. The pipeline was completed in 1998. On 17 April 1999, the inauguration ceremony of the Supsa Oil Terminal took place. The total costs of the construction of the pipeline and terminal were US$556 million.
}}</ref> At the same year the lead contract of the project was awarded to [[Kværner]]. The pipeline was completed in 1998. On 17 April 1999, the inauguration ceremony of the Supsa Oil Terminal took place. The total costs of the construction of the pipeline and terminal were US$556 million.


[[Image:Georgian Pipelines.gif|350px|thumb|left|Detailed route map of Baku-Supsa and [[Baku-Tbilisi-Ceyhan pipeline|Baku-Tbilisi-Ceyhan]] pipelines through [[2008 South Ossetia war|militarily-contested]] [[Georgia (country)|Georgia]].]]
The oil transportation by the pipeline was stopped on 21 October 2006 after abnormalities were revealed during the inspections on the pipeline.<ref name=az1>
The oil transportation by the pipeline was stopped on 21 October 2006 after abnormalities were revealed during the inspections on the pipeline.<ref name=az1>
{{cite news
{{cite news
| url = http://www.today.az/news/business/44358.html
| url = http://www.today.az/news/business/44358.html
| title = Oil pumping by Baku-Supsa pipeline to resume in May
| title = Oil pumping by Baku-Supsa pipeline to resume in May
| publisher = Today.Az
| publisher = Today.Az
| date = 2008-04-17
| date = 2008-04-17
| accessdate = 2008-06-08
| access-date = 2008-06-08
}}</ref> The large scale repair and replacement included replacement and re-routing of pipeline sections near [[Zestaponi]] in Georgia and [[Kura River]] crossing in Azerbaijan. Also several defects of the Soviet times sections were repaired. In total, the repair works cost US$53&nbsp;million. The oil shipment restarted in June 2008.<ref name=az2>
}}</ref> The large scale repair and replacement included replacement and re-routing of pipeline sections near [[Zestaponi]] in Georgia and [[Kura (Caspian Sea)|Kura River]] crossing in Azerbaijan. Also several defects of the Soviet times sections were repaired. In total, the repair works cost US$53&nbsp;million. The oil shipment restarted in June 2008.<ref name=az2>
{{cite news
{{cite news
| url = http://www.today.az/news/business/45482.html
| url = http://www.today.az/news/business/45482.html
Line 44: Line 45:
| publisher = Today.Az
| publisher = Today.Az
| date = 2008-06-05
| date = 2008-06-05
| accessdate = 2008-06-08
| access-date = 2008-06-08
}}</ref>
}}</ref>


After a major explosion and fire, which closed the [[Baku–Tbilisi–Ceyhan pipeline]] on 6 August 2008, the Baku–Supsa Pipeline was used to re-route Azeri oil deliveries.<ref name=upstream2>
After a major explosion and fire, which closed the [[Baku–Tbilisi–Ceyhan pipeline]] on 6 August 2008, the Baku–Supsa Pipeline was used to re-route Azeri oil deliveries.<ref name=upstream2>
{{cite news
{{cite news
| url = http://www.upstreamonline.com/live/article160568.ece
| url = http://www.upstreamonline.com/live/article160568.ece
Line 53: Line 54:
| publisher = Upstream Today
| publisher = Upstream Today
| date = 2008-08-07
| date = 2008-08-07
| accessdate = 2008-08-13
| access-date = 2008-08-13
}}</ref> On 12 August 2008, BP closed the pipeline for the safety reasons because of the [[2008 South Ossetia War|South Ossetia conflict]].<ref name=upstream1>
}}</ref> On 12 August 2008, BP closed the pipeline temporarily for safety reasons because of the [[2008 South Ossetia War|South Ossetia conflict]].<ref name=upstream1>
{{cite news
{{cite news
| url = http://www.upstreamonline.com/live/article160951.ece
| url = http://www.upstreamonline.com/live/article160951.ece
Line 60: Line 61:
| publisher = Upstream Today
| publisher = Upstream Today
| date = 2008-08-12
| date = 2008-08-12
| accessdate = 2008-08-13
| access-date = 2008-08-13
}}</ref> On August 10 and 12 2008, the Russian aviation had bombed the pipeline.<ref>{{Cite web |title=Supsa Terminal and Pipeline, Georgia - Hydrocarbons Technology |url=https://www.hydrocarbons-technology.com/projects/supsa/ |access-date=2022-04-04 |website=www.hydrocarbons-technology.com}}</ref> In Summer of 2012 pipeline was down a month for a maintenance.<ref>
{{cite news
| url = http://uk.reuters.com/article/uk-azerbaijan-pipeline-repair-idUKBRE85F0FF20120616
| title = BP resumes oil flows via Baku-Supsa pipeline
| publisher = Reuters
| access-date = 2012-06-16
}}</ref>
}}</ref>

In July 2015 Russian troops demarcating the de facto border of the self-proclaimed Republic of South Ossetia, pushed forward the border line near the village of Orchosani<ref>[https://www.businessinsider.com/georgia-accusing-russia-of-taking-territory-2015-7?r=US&IR=T In Business Insider, Orchosani is named as the village near the 'lost' section of pipeline]</ref> and thereby taking control over a short length of the pipeline.<ref name=BBC>
{{cite news
| url = https://www.bbc.co.uk/news/world-europe-33549462
| title = EU warning over Russia 'land grab' in South Ossetia border row
| publisher = BBC
| date = 2015-07-16
| access-date = 2015-08-09
}}</ref>
Analysts suggest that this was a Russian reaction to dissuade Georgia from making further moves towards joining NATO.
<ref>[http://www.jamestown.org/single/?tx_ttnews&#91;tt_news&#93;=44209&tx_ttnews&#91;backPid&#93;=7&cHash=19cd6195908c2080c70fe8816f81496b#.Vr4ur-ZqKQc Jamestown analysis of Russia's reasoning]</ref> While conceding that the pipeline might need to be diverted in the future, a Vice President of [[SOCAR]] reportedly denied any short term need for such concern.<ref>[http://en.apa.az/news/229769 APA reported: "“Even the routes of Baku-Supsa pipeline are not changed, this will not cause any problem for the pipeline”, SOCAR vice-president on investments and marketing Elshan Nasirov said."]</ref>

In June 2022, BP rerouted oil from the pipeline to the much bigger Baku–Tbilisi–Ceyhan pipeline due to security concerns.<ref name=close2022>{{cite web |title=Ukraine war forces closure of Azerbaijani oil export pipeline {{!}} Eurasianet |url=https://eurasianet.org/ukraine-war-forces-closure-of-azerbaijani-oil-export-pipeline |website=eurasianet.org |language=en}}</ref>


==Technical features==
==Technical features==
[[Image:Georgian Pipelines.gif|thumb|Detailed route map of Baku-Supsa and [[Baku-Tbilisi-Ceyhan pipeline|Baku-Tbilisi-Ceyhan]] pipelines through [[2008 South Ossetia war|militarily-contested]] [[Georgia (country)|Georgia]].]]
Essentially, the Baku–Supsa pipeline is a refurbished Soviet era pipeline with several newly built sections. It has six pumping stations and two pressure reduction stations in western Georgia. The four storage tanks at the Supsa terminal have a total capacity of 160,000&nbsp;cubic metres.<ref name=hydrocarbons>
Essentially, the Baku–Supsa pipeline is a refurbished Soviet era pipeline with several newly built sections. It has six pumping stations and two pressure reduction stations in western Georgia. The four storage tanks at the Supsa terminal have a total capacity of 160,000&nbsp;cubic metres.<ref name=hydrocarbons>
{{cite news
{{cite news
Line 69: Line 90:
| title = Supsa Terminal and Pipeline, Georgia / Azerbaijan
| title = Supsa Terminal and Pipeline, Georgia / Azerbaijan
| publisher = Hydrocarbons Technology
| publisher = Hydrocarbons Technology
| accessdate = 2008-06-08
| access-date = 2008-06-08
}}</ref> The capacity of the pipeline is 145,000&nbsp;barrel per day (bbl/d) with proposed upgrades to between 300,000&nbsp;bbl/d to 600,000&nbsp;bbl/d.
}}</ref> The capacity of the pipeline is 7.2 million tons a year<ref name=close2022/> ({{convert|145000|oilbbl/d}}) with proposed upgrades to between {{convert|300000|to|600000|oilbbl/d}}.

From 1999 to 2016, 76.3 million tons of oil were transported through the pipeline.<ref name=":0">{{Cite web |date=2016-05-16 |title=Baku-Supsa pipe's contribution to economic development of Azerbaijan, Georgia highlighted |url=https://www.azernews.az/oil_and_gas/96668.html |access-date=2022-04-04 |website=AzerNews.az |language=en}}</ref> In 2021, it carried 4.2 million tons.<ref name=close2022/>

The cost of transporting one ton of oil through the pipeline is $3.14 (2016), out of which Georgia gets a $1.2 share and Azerbaijan gets the rest.<ref name=":0" />


==See also==
==See also==
{{Portal|Azerbaijan|Georgia (country)|Energy}}
*[[Baku–Tbilisi–Ceyhan pipeline]]
*[[Baku–Tbilisi–Ceyhan pipeline]]
*[[Baku–Novorossiysk Pipeline]]
*[[Baku–Novorossiysk Pipeline]]
*[[Energy in Georgia (country)]]


== References ==
== References ==
{{Reflist}}
{{Reflist}}
{{Black Sea Energy}}


==External links==
==External links==
* [http://www.bp.com/sectiongenericarticle.do?categoryId=9006672&contentId=7015099 Western Route Export Pipeline (BP website)]
* [http://www.bp.com/sectiongenericarticle.do?categoryId=9006672&contentId=7015099 Western Route Export Pipeline (BP website)]


{{DEFAULTSORT:Baku-Supsa Pipeline}}
[[Category:Oil pipelines]]
[[Category:Energy in Azerbaijan]]
[[Category:Energy infrastructure completed in 1999]]
[[Category:Energy in Georgia (country)]]
[[Category:Oil pipelines in Azerbaijan]]
[[Category:Oil pipelines in Georgia (country)]]
[[Category:Caspian Sea]]
[[Category:Caspian Sea]]
[[Category:BP]]
[[Category:BP buildings and structures]]
[[Category:Azerbaijan–Georgia (country) relations]]

[[Category:Georgia (country)–Turkey relations]]
[[ka:ბაქო-სუფსის ნავთობსადენი]]
[[Category:Azerbaijan–Turkey relations]]
[[ru:Нефтепровод Баку — Супса]]
[[Category:Black Sea energy]]
[[Category:1999 establishments in Azerbaijan]]

Revision as of 04:35, 13 August 2024

Baku–Supsa Pipeline
Location of Baku–Supsa Pipeline
Location of Baku–Supsa Pipeline
Standort
LandAzerbaijan, Georgia, Turkey
General directioneast–west
FromBaku (Sangachal Terminal), Azerbaijan
Passes throughTbilisi
ToSupsa terminal in Georgia
Runs alongsideBaku–Tbilisi–Ceyhan pipeline (partly)
General information
Typoil
PartnersSOCAR, Azerbaijan International Operating Company, GIOC
OperatorBP
Commissioned1999
Technical information
Length833 km (518 mi)
Maximum discharge145,000 barrels (23,100 m3) per day

The Baku–Supsa Pipeline (also known as the Western Route Export Pipeline and Western Early Oil Pipeline) is an 833-kilometre (518 mi) long oil pipeline, which runs from the Sangachal Terminal near Baku to the Supsa terminal in Georgia. It transports oil from the Azeri-Chirag-Guneshli field. The pipeline is operated by BP.[1]

History

The preparations for the pipeline's construction started in 1994. On 8 March 1996, President of Azerbaijan Heydar Aliyev and President of Georgia Eduard Shevardnadze agreed on the establishment of Baku–Supsa pipeline. The trilateral contract was signed between Azerbaijan International Operating Company, SOCAR and the Government of Georgia.[2] At the same year the lead contract of the project was awarded to Kværner. The pipeline was completed in 1998. On 17 April 1999, the inauguration ceremony of the Supsa Oil Terminal took place. The total costs of the construction of the pipeline and terminal were US$556 million.

The oil transportation by the pipeline was stopped on 21 October 2006 after abnormalities were revealed during the inspections on the pipeline.[3] The large scale repair and replacement included replacement and re-routing of pipeline sections near Zestaponi in Georgia and Kura River crossing in Azerbaijan. Also several defects of the Soviet times sections were repaired. In total, the repair works cost US$53 million. The oil shipment restarted in June 2008.[4]

After a major explosion and fire, which closed the Baku–Tbilisi–Ceyhan pipeline on 6 August 2008, the Baku–Supsa Pipeline was used to re-route Azeri oil deliveries.[5] On 12 August 2008, BP closed the pipeline temporarily for safety reasons because of the South Ossetia conflict.[6] On August 10 and 12 2008, the Russian aviation had bombed the pipeline.[7] In Summer of 2012 pipeline was down a month for a maintenance.[8]

In July 2015 Russian troops demarcating the de facto border of the self-proclaimed Republic of South Ossetia, pushed forward the border line near the village of Orchosani[9] and thereby taking control over a short length of the pipeline.[10] Analysts suggest that this was a Russian reaction to dissuade Georgia from making further moves towards joining NATO. [11] While conceding that the pipeline might need to be diverted in the future, a Vice President of SOCAR reportedly denied any short term need for such concern.[12]

In June 2022, BP rerouted oil from the pipeline to the much bigger Baku–Tbilisi–Ceyhan pipeline due to security concerns.[13]

Technical features

Detailed route map of Baku-Supsa and Baku-Tbilisi-Ceyhan pipelines through militarily-contested Georgia.

Essentially, the Baku–Supsa pipeline is a refurbished Soviet era pipeline with several newly built sections. It has six pumping stations and two pressure reduction stations in western Georgia. The four storage tanks at the Supsa terminal have a total capacity of 160,000 cubic metres.[14] The capacity of the pipeline is 7.2 million tons a year[13] (145,000 barrels per day (23,100 m3/d)) with proposed upgrades to between 300,000 to 600,000 barrels per day (48,000 to 95,000 m3/d).

From 1999 to 2016, 76.3 million tons of oil were transported through the pipeline.[15] In 2021, it carried 4.2 million tons.[13]

The cost of transporting one ton of oil through the pipeline is $3.14 (2016), out of which Georgia gets a $1.2 share and Azerbaijan gets the rest.[15]

See also

References

  1. ^ BP site
  2. ^ "Transport routes of Azerbaijani oil (Baku-Novorossiysk, Baku-Supsa)". Azerbaijan Portal. Retrieved 2008-06-08.
  3. ^ "Oil pumping by Baku-Supsa pipeline to resume in May". Today.Az. 2008-04-17. Retrieved 2008-06-08.
  4. ^ "Baku-Supsa pipeline to be launched after repair". Today.Az. 2008-06-05. Retrieved 2008-06-08.
  5. ^ "BP diverts Ceyhan crude as fire still burns". Upstream Today. 2008-08-07. Retrieved 2008-08-13.
  6. ^ "BP shuts in Georgia links". Upstream Today. 2008-08-12. Retrieved 2008-08-13.
  7. ^ "Supsa Terminal and Pipeline, Georgia - Hydrocarbons Technology". www.hydrocarbons-technology.com. Retrieved 2022-04-04.
  8. ^ "BP resumes oil flows via Baku-Supsa pipeline". Reuters. Retrieved 2012-06-16.
  9. ^ In Business Insider, Orchosani is named as the village near the 'lost' section of pipeline
  10. ^ "EU warning over Russia 'land grab' in South Ossetia border row". BBC. 2015-07-16. Retrieved 2015-08-09.
  11. ^ Jamestown analysis of Russia's reasoning
  12. ^ APA reported: "“Even the routes of Baku-Supsa pipeline are not changed, this will not cause any problem for the pipeline”, SOCAR vice-president on investments and marketing Elshan Nasirov said."
  13. ^ a b c "Ukraine war forces closure of Azerbaijani oil export pipeline | Eurasianet". eurasianet.org.
  14. ^ "Supsa Terminal and Pipeline, Georgia / Azerbaijan". Hydrocarbons Technology. Retrieved 2008-06-08.
  15. ^ a b "Baku-Supsa pipe's contribution to economic development of Azerbaijan, Georgia highlighted". AzerNews.az. 2016-05-16. Retrieved 2022-04-04.