Jump to content

Torrens Linear Park: Difference between revisions

Coordinates: 34°52′S 138°43′E / 34.86°S 138.72°E / -34.86; 138.72
From Wikipedia, the free encyclopedia
Content deleted Content added
Added history of Torrens Linear Park - will add references later...
m redirect removed, so removing the hatnote
 
(33 intermediate revisions by 20 users not shown)
Line 1: Line 1:
{{Use dmy dates|date=September 2014}}
[[Image:Torrens valley.jpg|220px|right|thumb|Linear Park near [[Paradise_Interchange|Paradise Interchange]]]]
{{Use Australian English|date=September 2014}}
The '''Torrens Linear Park''' was completed in 1997 as the first of its kind developed in [[Australia]] where it is the largest hills-to-coast park. It began as a flood mitigation scheme along the [[River Torrens]] running from the [[Adelaide Hills]] to the sea. Cyclists and walkers can use a trail that runs the length of the park, from Gorge Road, in [[Athelstone, South Australia|Athelstone]] in the North east, through the Northern Parklands of Adelaide city to the river mouth at [[Henley Beach, South Australia|Henley Beach]] in the west. The river runs past many notable landmarks including the Adelaide Zoo, the Adelaide Botanic Park, The [[Adelaide Festival Centre|Festival Theatre]] and [[Elder Park]].
[[File:Torrens valley.jpg|220px|right|thumb|Linear Park near [[Paradise Interchange]]]]


The '''Torrens Linear Park''' was completed in 1997 as the first [[linear park|of its kind]] developed in [[Australia]] where it is the largest hills-to-coast park. It began as a flood mitigation scheme along the [[River Torrens]] running westward from the [[Adelaide Hills]], through the [[Adelaide, South Australia|Adelaide metropolitan area]], to the sea. Cyclists and walkers can use a trail that runs the {{convert|30|km|mi|abbr=on}} length of the park, from Gorge Road, in [[Athelstone, South Australia|Athelstone]] in the north-east, through the [[Adelaide Park Lands|Northern Parklands]] of the [[City of Adelaide]], to the river mouth at [[Henley Beach, South Australia|Henley Beach]] in the west.<ref name="aila">[http://www.aila.org.au/projects/sa/linear/dexter.htm The Australian Institute of Landscape Architects >...> River Torrens Linear Park, Adelaide] Accessed 6 December 2013.</ref> In the Parklands section, the river runs past many notable landmarks including the [[Adelaide Zoo]], the [[Adelaide Botanic Gardens]], the [[Adelaide Festival Centre|Festival Theatre]] and [[Elder Park]].
The Torrens Linear Park concept was created in 1996 following the initial flood mitigation study produced in 1987 as flooding had become a big issue in post WW2 Adelaide as the rapidly expanding urban area produced more runoff than the catchment could handle. The Linear Park became protected against further development with the passing of the River Torrens Linear Park Act on 21 June 2006.

There are shared-use pedestrian and cycling paths along both sides of the river for most of the length of the park, and along one side of the [[O-Bahn Busway]].<ref>{{cite web |url=http://www.southaustraliantrails.com/top_trails.asp?torrens |title=Top Trails - Trails SA - Torrens |work=South Australian Trails |publisher=[[Government of South Australia]] |accessdate=19 June 2014}}</ref>

==History==
The valley of the River Torrens, particularly its lower reaches, had become badly polluted following European settlement in 1836. Land clearance lead to increased runoff and erosion, with major flood events occurring in 1917 and 1933. An artificial channel, Breakout Creek, was completed in 1937, diverting floodwaters directly to the sea, and opening up areas of the western suburbs to housing development, particularly after World War II. Rapid expansion of housing in the eastern suburbs also took place at this time. Awareness of the risk of increased runoff leading to further flooding events lead to various proposals for flood mitigation in the 1950s and 1960s, including converting the river to a concrete-lined channel, or an underground storm-water pipe below a major highway.<ref name="aila" />

The Torrens Linear Park concept, using the river valley for combined use as [[urban open space]] with [[flood mitigation]], was initially set out in the ''River Torrens Study'' (1979) and the ''River Torrens Flood Mitigation Study'' (1980). The ''River Torrens Linear Park and Flood Mitigation Scheme'' was approved by State Parliament in 1981. A further elaboration, the ''River Torrens Linear Park Study'', included a transport option for a section of the park east of the CBD, which became the [[O-Bahn Busway|O-Bahn guided busway]].<ref name="aila" />

The scheme required the cooperation of the state government, responsible for land acquisition and flood mitigation works, and the then 12 (now 8) metropolitan councils bordering the river, responsible for landscaping and construction of cycling/walking trails. Construction works began in January 1982, and were completed in September 1997.<ref name="aila" />

The Linear Park became protected against further development with the passing of the ''River Torrens Linear Park Act'' on 21 June 2006.<ref>Greg Kelton, Laws to protect park's future. ''The Advertiser'', 26 April 2006.</ref>

Between 2007 and 2008 a new aqueduct, an underground water pipe from Gorge Weir to the Hope Valley Reservoir,<ref>James Quast, Concerns in pipeline. ''Leader Messenger'', 24 November 2004.</ref> was constructed along an eastern section of the Linear Park, while the land formerly occupied by the open channel of the old Highbury Aqueduct was added to the Linear Park in 2012.<ref>Erin Jones, [http://www.adelaidenow.com.au/news/highbury-aqueduct-site-to-open-to-the-public-next-week/story-e6frea6u-1226526617329 Highbury Aqueduct site to open to the public next week] ''Leader Messenger'', 29 November 2012. Accessed 6 December 2013.</ref>

==References==
{{reflist}}

{{coord |-34.86 |138.72 |dim:30km_type:landmark |display=title}} <!-- eastern end -->


{{adelaide-geo-stub}}
[[Category:Parks in Adelaide]]
[[Category:Parks in Adelaide]]
[[Category:Cycling in South Australia]]

Latest revision as of 10:11, 6 April 2020

Linear Park near Paradise Interchange

The Torrens Linear Park was completed in 1997 as the first of its kind developed in Australia where it is the largest hills-to-coast park. It began as a flood mitigation scheme along the River Torrens running westward from the Adelaide Hills, through the Adelaide metropolitan area, to the sea. Cyclists and walkers can use a trail that runs the 30 km (19 mi) length of the park, from Gorge Road, in Athelstone in the north-east, through the Northern Parklands of the City of Adelaide, to the river mouth at Henley Beach in the west.[1] In the Parklands section, the river runs past many notable landmarks including the Adelaide Zoo, the Adelaide Botanic Gardens, the Festival Theatre and Elder Park.

There are shared-use pedestrian and cycling paths along both sides of the river for most of the length of the park, and along one side of the O-Bahn Busway.[2]

History

[edit]

The valley of the River Torrens, particularly its lower reaches, had become badly polluted following European settlement in 1836. Land clearance lead to increased runoff and erosion, with major flood events occurring in 1917 and 1933. An artificial channel, Breakout Creek, was completed in 1937, diverting floodwaters directly to the sea, and opening up areas of the western suburbs to housing development, particularly after World War II. Rapid expansion of housing in the eastern suburbs also took place at this time. Awareness of the risk of increased runoff leading to further flooding events lead to various proposals for flood mitigation in the 1950s and 1960s, including converting the river to a concrete-lined channel, or an underground storm-water pipe below a major highway.[1]

The Torrens Linear Park concept, using the river valley for combined use as urban open space with flood mitigation, was initially set out in the River Torrens Study (1979) and the River Torrens Flood Mitigation Study (1980). The River Torrens Linear Park and Flood Mitigation Scheme was approved by State Parliament in 1981. A further elaboration, the River Torrens Linear Park Study, included a transport option for a section of the park east of the CBD, which became the O-Bahn guided busway.[1]

The scheme required the cooperation of the state government, responsible for land acquisition and flood mitigation works, and the then 12 (now 8) metropolitan councils bordering the river, responsible for landscaping and construction of cycling/walking trails. Construction works began in January 1982, and were completed in September 1997.[1]

The Linear Park became protected against further development with the passing of the River Torrens Linear Park Act on 21 June 2006.[3]

Between 2007 and 2008 a new aqueduct, an underground water pipe from Gorge Weir to the Hope Valley Reservoir,[4] was constructed along an eastern section of the Linear Park, while the land formerly occupied by the open channel of the old Highbury Aqueduct was added to the Linear Park in 2012.[5]

References

[edit]
  1. ^ a b c d The Australian Institute of Landscape Architects >...> River Torrens Linear Park, Adelaide Accessed 6 December 2013.
  2. ^ "Top Trails - Trails SA - Torrens". South Australian Trails. Government of South Australia. Retrieved 19 June 2014.
  3. ^ Greg Kelton, Laws to protect park's future. The Advertiser, 26 April 2006.
  4. ^ James Quast, Concerns in pipeline. Leader Messenger, 24 November 2004.
  5. ^ Erin Jones, Highbury Aqueduct site to open to the public next week Leader Messenger, 29 November 2012. Accessed 6 December 2013.

34°52′S 138°43′E / 34.86°S 138.72°E / -34.86; 138.72