Jump to content

Line 9 (CPTM): Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
No edit summary
No edit summary
Line 23: Line 23:
| stations = 19
| stations = 19
| routes = {{Plainlist|
| routes = {{Plainlist|
* [[Osasco (CPTM)|Osasco]] ↔ [[Mendes-Vila Natal (CPTM)|Mendes-Vila Natal]]
* [[Osasco (CPTM)|Osasco]] ↔ [[Bruno Covas/Mendes-Vila Natal (CPTM)|Bruno Covas/Mendes-Vila Natal]]
* [[Pinheiros (CPTM)|Pinheiros]] ↔ [[Jurubatuba (CPTM)|Jurubatuba]] {{small|(rush hour)}}
* [[Pinheiros (CPTM)|Pinheiros]] ↔ [[Jurubatuba (CPTM)|Jurubatuba]] {{small|(rush hour)}}
}}
}}
Line 30: Line 30:
| open = 1957
| open = 1957
| close =
| close =
| lastextension = 26 September 1992
| lastextension = 10 August 2021
| owner = [[File:Bandeira do estado de São Paulo.svg|20px]] Government of the State of São Paulo
| owner = [[File:Bandeira do estado de São Paulo.svg|20px]] Government of the State of São Paulo
| operator = {{rint|saopaulo|cptm}} [[Companhia Paulista de Trens Metropolitanos|CPTM]] (1994–2022)<br>[[File:ViaMobilidade logo.png|17px|link=ViaMobilidade]] [[ViaMobilidade]] (2022–2052)<ref>{{cite web|url=https://www.metrocptm.com.br/governo-doria-homologa-concessao-das-linhas-8-e-9-para-a-viamobilidade/|title=Governo Doria homologa concessãro das Linhas 8 e 9 para a ViaMobilidade|website=Metrô CPTM|language=pt|first=Jean|last=Carlos|date=31 May 2021|accessdate=4 June 2021}}</ref><ref>{{cite web|url=https://noticiando.net/viamobilidade-assume-a-operacao-das-linhas-8-e-9-em-janeiro-de-2022/|title=ViaMobilidade assume a operação das linhas 8 e 9 em janeiro de 2022|website=Rede Noticiando|language=pt|first=Igor|last=Roberto|date=3 June 2021|accessdate=4 June 2021}}</ref>
| operator = {{rint|saopaulo|cptm}} [[Companhia Paulista de Trens Metropolitanos|CPTM]] (1994–2022)<br>[[File:ViaMobilidade logo.png|17px|link=ViaMobilidade]] [[ViaMobilidade]] (2022–2052)<ref>{{cite web|url=https://www.metrocptm.com.br/governo-doria-homologa-concessao-das-linhas-8-e-9-para-a-viamobilidade/|title=Governo Doria homologa concessãro das Linhas 8 e 9 para a ViaMobilidade|website=Metrô CPTM|language=pt|first=Jean|last=Carlos|date=31 May 2021|accessdate=4 June 2021}}</ref><ref>{{cite web|url=https://noticiando.net/viamobilidade-assume-a-operacao-das-linhas-8-e-9-em-janeiro-de-2022/|title=ViaMobilidade assume a operação das linhas 8 e 9 em janeiro de 2022|website=Rede Noticiando|language=pt|first=Igor|last=Roberto|date=3 June 2021|accessdate=4 June 2021}}</ref>
Line 65: Line 65:
{| class="wikitable"
{| class="wikitable"
!align="center"|
!align="center"|
!align="center"|'''Osasco ↔ Grajaú'''
!align="center"|'''Osasco ↔ Bruno Covas/Mendes-Vila Natal'''
|-
|-
|-
|-
|align="left"|'''Extension'''
|align="left"|'''Extension'''
|align="center"|31,8 km
|align="center"|32,8 km
|-
|-
|align="left"|'''Average number of passengers carried/day'''
|align="left"|'''Average number of passengers carried/day'''

Revision as of 01:57, 30 August 2021

Line 9 (Emerald)
Übersicht
StatusOperational
Owner Government of the State of São Paulo
LocaleSão Paulo, Brazil
Termini
Connecting lines
Stations19
Service
TypCommuter rail
SystemSão Paulo Metro
Services
Operator(s) CPTM (1994–2022)
ViaMobilidade (2022–2052)[1][2]
Depot(s)
  • Presidente Altino rail yard
  • Grajaú rail yard
  • Varginha rail yard (under construction)
Rolling stock
  • 304 CAF Series 7000 (38 trains)
  • 280 CAF Series 8000 (35 trains)
History
Opened1957
Last extension10 August 2021
Technical
Line length32.8 km (20.4 mi)
CharacterAt-grade
Track gauge1,600 mm (5 ft 3 in)
Electrification3,000 V DC catenary
Operating speed80 km/h (50 mph)
SignallingAutomatic block signaling
Route map

to Amador Bueno
Osasco
Viaduto Dona Ignez Collino
Viaduto Guerino Spitaletti
Presidente Altino rail yard
Presidente Altino
Viaduto Único Gallafrio
Ceasa
Ponte do Jaguaré
Villa Lobos–Jaguaré
Cidade Universitária
Pinheiros
Ponte Bernardo Goldfarb
Ponte Eusébio Matoso
Hebraica–Rebouças
Cidade Jardim
Ponte Eng° Roberto R. Zuccolo
Vila Olímpia
Ponte Eng° Ari Torres
Berrini
Ponte Morumbi
Ponte Nova Morumbi
Morumbi
Granja Julieta
Ponte Laguna
João Dias
Viaduto João Dias
Viaduto Transamérica
Santo Amaro
Socorro
Ponte Socorro
Jurubatuba
Ponte Jurubatuba
Autódromo
Primavera–Interlagos
Av. Dona Belmina Marin
Grajaú
Grajaú rail yard
Bruno Covas/Mendes–Vila Natal
Down arrow Under construction
Varginha
Varginha rail yard

Line 9 (Emerald) (Portuguese: Linha 9–Esmeralda), formerly Line C (Sky Blue) (Linha C–Celeste) and Line C (Emerald) (Linha C-Esmeralda), is one of the seven lines operated by CPTM and one of the thirteen lines that make up the São Paulo Metro Rail Transport Network, in Brazil.[3] In a close future, ViaMobilidade will operate the line for 30 years, along with Line 8-Diamond.[4]

Characteristics

Osasco ↔ Bruno Covas/Mendes-Vila Natal
Extension 32,8 km
Average number of passengers carried/day 613.000
Gap time between trains (rush hour) 4 min
Stations 19
Trains (rush hour) 20 (24)
Time of ride 53 min (approx.)
Medium distance between stations 1,93 km (1,19 mi)
Seats offer (rush hour) 9345
Medium velocity (highest) 36 km/h / 22 mph (90 km/h / 56 mph)
Level crossing 0

Stations

Template:CPTM Stations/Line 9

See also

References

  1. ^ Carlos, Jean (31 May 2021). "Governo Doria homologa concessãro das Linhas 8 e 9 para a ViaMobilidade". Metrô CPTM (in Portuguese). Retrieved 4 June 2021.
  2. ^ Roberto, Igor (3 June 2021). "ViaMobilidade assume a operação das linhas 8 e 9 em janeiro de 2022". Rede Noticiando (in Portuguese). Retrieved 4 June 2021.
  3. ^ Line 9 (CPTM) Website (Portuguese) Archived 2011-04-26 at the Wayback Machine
  4. ^ "Pela 1ª vez, governo de SP concede linhas de trens da CPTM à iniciativa privada; CCR assume linhas 8 e 9 por 30 anos". G1 (in Portuguese). 20 April 2021. Retrieved 20 April 2021.