Jump to content

Line S1 (Taizhou Rail Transit): Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
No edit summary
Line 13: Line 13:
| status =
| status =
| locale = [[Taizhou, Zhejiang|Taizhou]], [[Zhejiang]], China
| locale = [[Taizhou, Zhejiang|Taizhou]], [[Zhejiang]], China
| start = [[Taizhou railway station|Taizhou Huochezhan]]
| start = [[Taizhou railway station (Zhejiang Province)|Taizhou Huochezhan]]
| end = [[Chengnan station|Chengnan]]
| end = [[Chengnan station|Chengnan]]
| stations = 15
| stations = 15
Line 21: Line 21:
| close =
| close =
| owner =
| owner =
| operator = Taizhou Rail Transit corporation
| operator = Taizhou Rail Transit Corporation
| character = Underground and Elevated
| character = Underground and Elevated
| depot =
| depot =
Line 36: Line 36:
| map_state = collapsed
| map_state = collapsed
}}
}}
'''Line S1''' of the [[Taizhou Rail Transit]] is a suburban rapid transit line currently under construction in Taizhou that will be running from Taizhou Railway Station to Chengnan. It is expected to open on 28 December 2022. The line will be 52.4 kilometres long.<ref name=test202204>{{cite web|url=http://www.zjtz.gov.cn/art/2022/4/8/art_1229630844_59057086.html|date=2022-04-08|title=市域铁路S1线:决胜“6·30”全线完工试运行}}</ref>
'''Line S1''' of the [[Taizhou Rail Transit]] is a suburban rapid transit line currently under construction in Taizhou that will be running from [[Taizhou railway station (Zhejiang Province)|Taizhou Huochezhan]] to Chengnan. It is expected to open on 28 December 2022. The line will be 52.4 kilometres long.<ref name=test202204>{{cite web|url=http://www.zjtz.gov.cn/art/2022/4/8/art_1229630844_59057086.html|date=2022-04-08|title=市域铁路S1线:决胜“6·30”全线完工试运行}}</ref>


==Stations==
==Stations==

Revision as of 14:45, 27 December 2022

Line S1
 S1 
Übersicht
LocaleTaizhou, Zhejiang, China
Termini
Stations15
Service
TypRapid transit
SystemTaizhou Rail Transit
Operator(s)Taizhou Rail Transit Corporation
History
Opened28 December 2022
Technical
Line length52.4 km (32.6 mi)[1]
Number of tracks2
CharacterUnderground and Elevated
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead lines, AC 25 kV 50 Hz
Operating speed140 km/h (maximum speed)[1]

Line S1 of the Taizhou Rail Transit is a suburban rapid transit line currently under construction in Taizhou that will be running from Taizhou Huochezhan to Chengnan. It is expected to open on 28 December 2022. The line will be 52.4 kilometres long.[1]

Stations

Station name Transfer Distance
km
Standort
Pinyin Chinese
Taizhou Huochezhan 台州火车站 Taizhou
Xueyuan Lu 学院路
Guobo Zhongxin 国博中心
Huifeng Lu 汇丰路
Jintai 锦泰
Enze Yiyuan 恩泽医院
Taizhou Qiche Nanzhan 台州汽车南站
Zeguo 泽国
Wenling Huochezhan 温岭火车站
Huichuanwang 汇川王
Wenling Diyi Renmin Yiyuan 温岭第一人民医院
Jiulong Dadao 九龙大道
Wanchang Lu 万昌路
Nanping 南屏
Chengnan 城南

References

  1. ^ a b c "市域铁路S1线:决胜"6·30"全线完工试运行". 2022-04-08.