Jump to content

Barry Railway Class D: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
copy edit
replace deprecated parameters
Line 1: Line 1:
{{Use dmy dates|date=September 2012}}
{{Use dmy dates|date=September 2012}}
{{Infobox locomotive
{{Infobox locomotive
| name = Barry Railway Class D
| name = Barry Railway Class D
| powertype = Steam
| powertype = Steam
| image =
| image =
| alt =
| alt =
| caption =
| caption =
| designer = John Waddington Mann
| designer = John Waddington Mann
| builder = [[Sharp, Stewart & Co.]]
| builder = [[Sharp, Stewart & Co.]]
| ordernumber =
| ordernumber =
| serialnumber =
| serialnumber =
| buildmodel =
| buildmodel =
| builddate = 1889 and 1897
| builddate = 1889 and 1897
| totalproduction = 4
| totalproduction = 4
| rebuilder =
| rebuilder =
| rebuilddate =
| rebuilddate =
| numberrebuilt =
| numberrebuilt =
| whytetype = [[0-8-0]]
| whytetype = [[0-8-0]]
| uicclass = D n2t
| uicclass = D n2t
| gauge = {{RailGauge|ussg}}
| gauge = {{RailGauge|ussg}}
| driverdiameter = {{convert|4|ft|3|in|m|3|abbr=on}}
| driverdiameter = {{convert|4|ft|3|in|m|3|abbr=on}}
| trailingdiameter =
| trailingdiameter =
| minimumcurve =
| minimumcurve =
| wheelbase = {{convert|15|ft|5|in|m|3|abbr=on}}
| wheelbase = {{convert|15|ft|5|in|m|3|abbr=on}}
| length =
| length =
| width =
| width =
| height =
| height =
| axleload =
| axleload =
| weightondrivers =
| weightondrivers =
| locoweight = {{TonCwt to t|48|17}}
| locoweight = {{TonCwt to t|48|17}}
| fueltype = Coal
| fueltype = Coal
| fuelcap =
| fuelcap =
| watercap =
| watercap =
| sandcap =
| sandcap =
| boiler =
| boiler =
| boilerpressure =
| boilerpressure =
| feedwaterheater =
| feedwaterheater =
| firearea =
| firearea =
| tubearea =
| tubearea =
| fluearea =
| fluearea =
| tubesandflues =
| tubesandflues =
| fireboxarea =
| fireboxarea =
Line 46: Line 46:
| cylindercount = Two outside
| cylindercount = Two outside
| cylindersize = {{convert|20|x|26|in|abbr=on}}
| cylindersize = {{convert|20|x|26|in|abbr=on}}
| valvegear =
| valvegear =
| valvetype =
| valvetype =
| valvetravel =
| valvetravel =
| valvelap =
| valvelap =
| valvelead =
| valvelead =
| transmission =
| transmission =
| topspeed =
| maxspeed =
| poweroutput =
| poweroutput =
| tractiveeffort = {{convert|27200|lbf|kN|2|abbr=on}}
| tractiveeffort = {{convert|27200|lbf|kN|2|abbr=on}}
Line 60: Line 60:
| locobrakeforce =
| locobrakeforce =
| trainbrakes =
| trainbrakes =
| safety =
| safety =
| operator = [[Barry Railway|BR]] → [[Great Western Railway|GWR]]
| operator = {{ubl|[[Barry Railway]]|→ [[Great Western Railway]]}}
| opertorclass =
| opertorclass =
| powerclass =
| powerclass =
Line 69: Line 69:
| nicknames =
| nicknames =
| axleloadclass =
| axleloadclass =
| locale =
| locale =
| deliverydate = 1889 and 1897
| deliverydate = 1889 and 1897
| firstrundate =
| firstrundate =
| lastrundate =
| lastrundate =
| withdrawndate = 1927–1930
| withdrawndate = 1927–1930
| scrapdate =
| scrapdate =
| disposition = All scrapped
| disposition = All scrapped
| notes =
| notes =
}}
}}


==Scandinavian Origins==
==Scandinavian Origins==
'''Barry Railway Class D''' were [[0-8-0T]] steam [[tender engine]]s of the [[Barry Railway]] in [[South Wales]]. They were built to a standard [[Sharp Stewart]] design modified by [[John Waddington Mann]], the Chief Mechanical Engineer for the Swedish & Norwegian Railway. In fact, 20 of these locomotives were ordered by this railway. However the company ran into severe financial difficulty with the result that only one and a half locomotives were paid for by the S & N.
'''Barry Railway Class D''' were [[0-8-0T]] steam [[tender engine]]s of the [[Barry Railway]] in [[South Wales]]. They were built to a standard [[Sharp, Stewart and Company]] design modified by [[John Waddington Mann]], the Chief Mechanical Engineer for the Swedish & Norwegian Railway. In fact, 20 of these locomotives were ordered by this railway. However the company ran into severe financial difficulty with the result that only one and a half locomotives were paid for by the S & N.


==Barry Purchases==
==Barry Purchases==
Two of the locomotives, S & N 25 and 26, never reached overseas but were retained by Sharp Stewart. They were later sold to the Barry Railway in October 1889 and became numbers 35 and 36. Two other locomotives, S & N 5 and 8, were seized by bailiffs in December 1891. There then followed a long drawn out legal dispute between Sharp Stewart and S & N. It was not until May 1895 that the Supreme Court in Sweden found in favour of Sharp Stewart and the engines in question were returned to the manufacturers. In late 1896, they were offered to the Barry Railway who took delivery of them in March and April 1897. The two locomotives were numbered 92 and 93.
Two of the locomotives, S&N 25 and 26, never reached overseas but were retained by Sharp, Stewart. They were later sold to the Barry Railway in October 1889 and became numbers 35 and 36. Two other locomotives, S&N 5 and 8, were seized by bailiffs in December 1891. There then followed a long drawn out legal dispute between Sharp, Stewart and Swedish & Norwegian Railway. It was not until May 1895 that the Supreme Court in Sweden found in favour of Sharp, Stewart and the engines in question were returned to the manufacturers. In late 1896, they were offered to the Barry Railway who took delivery of them in March and April 1897. The two locomotives were numbered 92 and 93.


==Traffic Duties==
==Traffic Duties==
Line 95: Line 95:
! Year !! Quantity !! Manufacturer !! Serial Numbers !! Barry Numbers !! GWR Numbers !! Notes
! Year !! Quantity !! Manufacturer !! Serial Numbers !! Barry Numbers !! GWR Numbers !! Notes
|-
|-
| 1886 || 1 || [[Sharp Stewart]] || 3365 || 92 || 1389 || Acquired by Barry Railway April 1897
| 1886 || 1 || [[Sharp Stewart]] || 3365 || 92 || 1389 || align=left | Acquired by Barry Railway April 1897
|-
|-
| 1887 || 1 || [[Sharp Stewart]] || 3394 || 93 || 1390 || Acquired by Barry Railway March 1897
| 1887 || 1 || [[Sharp Stewart]] || 3394 || 93 || 1390 || align=left | Acquired by Barry Railway March 1897
|-
|-
| 1888 || 2 || [[Sharp Stewart]] || 3446–3447 || 35–36 || 1387–1388 || Acquired by Barry Railway October 1889
| 1888 || 2 || [[Sharp Stewart]] || 3446–3447 || 35–36 || 1387–1388 || align=left | Acquired by Barry Railway October 1889
|}
|}



Revision as of 13:36, 20 April 2014

Barry Railway Class D
Type and origin
Power typeSteam
DesignerJohn Waddington Mann
BuilderSharp, Stewart & Co.
Build date1889 and 1897
Total produced4
Specifications
Configuration:
 • Whyte0-8-0
 • UICD n2t
Gauge4 ft 8+12 in (1,435 mm)
Driver dia.4 ft 3 in (1.295 m)
Wheelbase15 ft 5 in (4.699 m)
Loco weight48 long tons 17 cwt (109,400 lb or 49.6 t)
Fuel typeCoal
CylindersTwo outside
Cylinder size20 in × 26 in (510 mm × 660 mm)
Performance figures
Tractive effort27,200 lbf (120.99 kN)
Career
Operators
Delivered1889 and 1897
Withdrawn1927–1930
DispositionAll scrapped

Scandinavian Origins

Barry Railway Class D were 0-8-0T steam tender engines of the Barry Railway in South Wales. They were built to a standard Sharp, Stewart and Company design modified by John Waddington Mann, the Chief Mechanical Engineer for the Swedish & Norwegian Railway. In fact, 20 of these locomotives were ordered by this railway. However the company ran into severe financial difficulty with the result that only one and a half locomotives were paid for by the S & N.

Barry Purchases

Two of the locomotives, S&N 25 and 26, never reached overseas but were retained by Sharp, Stewart. They were later sold to the Barry Railway in October 1889 and became numbers 35 and 36. Two other locomotives, S&N 5 and 8, were seized by bailiffs in December 1891. There then followed a long drawn out legal dispute between Sharp, Stewart and Swedish & Norwegian Railway. It was not until May 1895 that the Supreme Court in Sweden found in favour of Sharp, Stewart and the engines in question were returned to the manufacturers. In late 1896, they were offered to the Barry Railway who took delivery of them in March and April 1897. The two locomotives were numbered 92 and 93.

Traffic Duties

On arrival, the locomotives did very little main line duty but were confined to pulling heavy coal trains from Cadoxton Yard to Barry Docks. However in 1909, 92 and 93 were assigned to haul mineral trains from the coal pits on the Rhymney branch of the Brecon and Merthyr to Cadoxton Yard and were mechanically modified for the purpose.

Withdrawal

The locomotives passed to the Great Western Railway in 1922 but were withdrawn between 1927 and 1930. None survived into British Railways ownership and none have been preserved.

Numbering

Year Quantity Manufacturer Serial Numbers Barry Numbers GWR Numbers Notes
1886 1 Sharp Stewart 3365 92 1389 Acquired by Barry Railway April 1897
1887 1 Sharp Stewart 3394 93 1390 Acquired by Barry Railway March 1897
1888 2 Sharp Stewart 3446–3447 35–36 1387–1388 Acquired by Barry Railway October 1889

References

  • Barrie, D. S. M. (1983). The Barry Railway (reprint with addenda and amendments). Oakwood Press. pp. 199–200. ISBN 0853612366. {{cite book}}: Invalid |ref=harv (help)
  • Davies, F. K.; Firth, J. M.; Lucking, J. H.; Thomas, R. E.; Allcock, N. J.; Sterndale, A. C.; Barrie, D. S. M.; Reed, P. J. T.; Mountford, E. R. (April 1966). White, D. E. (ed.). The Locomotives of the Great Western Railway, part ten: Absorbed Engines, 1922–1947. RCTS. pp. K34–K37. ISBN 0-901115-20-7.
  • Miller, Brian J. (1984). Rails to Prosperity – The Barry & After 1884–1984. Regional Publications (Bristol) Ltd. p. 12. ISBN 0906570174. {{cite book}}: Invalid |ref=harv (help)
  • Mountford, Eric R. (1987). The Barry Railway – Diagrams and Photographs of Locomotives, Coaches and Wagons. Headington: Oakwood Press. p. 12. ISBN 0853613559. {{cite book}}: Invalid |ref=harv (help)
  • Russell, J. H. (1978). Great Western Absorbed Engines. Oxford Publishing Company. p. 44. ISBN 0902888749. {{cite book}}: Invalid |ref=harv (help)