Jump to content

SpaceX CRS-18: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
No edit summary
Tags: Mobile edit Mobile web edit
No edit summary
Tags: Mobile edit Mobile web edit
Line 17: Line 17:
| power = <!--end-of-life power, in watts-->
| power = <!--end-of-life power, in watts-->


| launch_date = '''Planned:''' 21 July 2019, 7:32 p.m.EDT(23:32 UTC)<ref name="sfn-schedule" />
| launch_date = '''Planned:''' 21 July 2019, 7:32 p.m. EDT (23:32 UTC)<ref name="sfn-schedule" />
| launch_rocket = [[Falcon 9 Full Thrust|Falcon 9]]
| launch_rocket = [[Falcon 9 Full Thrust|Falcon 9]]
| launch_site = [[CCAFS|Cape Canaveral]] [[SLC-40]]
| launch_site = [[CCAFS|Cape Canaveral]] [[SLC-40]]

Revision as of 23:30, 11 July 2019

SpaceX CRS-18
Artist rendering of the SpaceX Dragon spacecraft being berthed to ISS
Mission typeISS resupply
OperatorSpaceX
COSPAR ID2019-044A Edit this at Wikidata
SATCAT no.44446Edit this on Wikidata
Spacecraft properties
SpacecraftDragon C20
Spacecraft typeDragon CRS
ManufacturerSpaceX
Dry mass4,200 kg (9,300 lb)
DimensionsHeight: 6.1 m (20 ft)
Diameter: 3.7 m (12 ft)
Start of mission
Launch datePlanned: 21 July 2019, 7:32 p.m. EDT (23:32 UTC)[1]
RocketFalcon 9
Launch siteCape Canaveral SLC-40
ContractorSpaceX
Orbital parameters
Reference systemGeocentric
RegimeLow Earth
Inclination51.6°
Berthing at ISS
Berthing portHarmony nadir or Unity nadir
RMS capturePlanned: July 2019
Berthing datePlanned: July 2019
NASA SpX-18 mission patch
NASA SpX-18 mission patch

SpaceX CRS-18, also known as SpX-18, is SpaceX's 18th flight to the International Space Station under the Commercial Resupply Services program for NASA. Launch is currently anticipated on 21 July 2019 (TBD) aboard a Falcon 9 rocket.[1]

Launch schedule history

On February 2016, it was announced that NASA had awarded a contract extension to SpaceX for five CRS additional missions (CRS-16 to CRS-20).[2] This flight was originally scheduled in December 2016[3] before two delays to July 2019.[4][1]

Primary payload

NASA has contracted for the CRS-18 mission from SpaceX and therefore determines the primary payload, date/time of launch, and orbital parameters for the Dragon space capsule. It will carry the third International Docking Adapter (IDA-3).[5]

See also

References

  1. ^ a b c "Launch Schedule". Spaceflight Now. 11 February 2019. Retrieved 17 February 2019.
  2. ^ de Selding, Peter B. (24 February 2016). "SpaceX wins 5 new space station cargo missions in NASA contract estimated at $700 million". Space News. Retrieved 24 February 2016.
  3. ^ NASA Office of Inspector General (June 28, 2016). NASA’s Response to SpaceX’s June 2015 Launch Failure: Impacts on Commercial Resupply of the International Space Station (PDF) (Report). NASA Office of Inspector General. p. 13. Retrieved 2016-07-18.
  4. ^ "Upcoming Missions". SpaceXNow.com. Retrieved 31 May 2018.
  5. ^ Pietrobon, Steven (August 20, 2018). "United States Commercial ELV Launch Manifest". Retrieved August 21, 2018.