Jump to content

SpaceX CRS-18: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
m same as last, but better formatting
m fixed typographical error
Line 17: Line 17:
| power = <!--end-of-life power, in watts-->
| power = <!--end-of-life power, in watts-->


| launch_date = 25 July 2019, 22:21 UTC (planned) <ref>https://twitter.com/SpaceX/status/1154155687636717568</ref>
| launch_date = 25 July 2019, 22:01 UTC (planned) <ref>https://twitter.com/SpaceX/status/1154155687636717568</ref>
| launch_rocket = [[Falcon 9 Full Thrust|Falcon 9]]
| launch_rocket = [[Falcon 9 Full Thrust|Falcon 9]]
| launch_site = [[CCAFS|Cape Canaveral]] [[SLC-40]]
| launch_site = [[CCAFS|Cape Canaveral]] [[SLC-40]]

Revision as of 22:45, 24 July 2019

SpaceX CRS-18
Artist rendering of the SpaceX Dragon spacecraft being berthed to ISS
Mission typeISS resupply
OperatorSpaceX
COSPAR ID2019-044A Edit this at Wikidata
SATCAT no.44446Edit this on Wikidata
Spacecraft properties
SpacecraftDragon C20
Spacecraft typeDragon CRS
ManufacturerSpaceX
Dry mass4,200 kg (9,300 lb)
DimensionsHeight: 6.1 m (20 ft)
Diameter: 3.7 m (12 ft)
Start of mission
Launch date25 July 2019, 22:01 UTC (planned) [1]
RocketFalcon 9
Launch siteCape Canaveral SLC-40
ContractorSpaceX
Orbital parameters
Reference systemGeocentric
RegimeLow Earth
Inclination51.6°
Berthing at ISS
Berthing portHarmony nadir or Unity nadir
RMS capturePlanned: July 2019
Berthing datePlanned: July 2019
NASA SpX-18 mission patch
NASA SpX-18 mission patch  

SpaceX CRS-18, also known as SpX-18, is SpaceX's 18th flight to the International Space Station under the Commercial Resupply Services program for NASA. Launch is currently anticipated on 24 July 2019 aboard a Falcon 9 rocket.[2]

The same Dragon capsule has previously flown to the ISS in April 2015 and December 2017.[3] This is the first time a capsule is used for a third flight.

Launch schedule history

On February 2016, it was announced that NASA had awarded a contract extension to SpaceX for five CRS additional missions (CRS-16 to CRS-20).[4] This flight was originally scheduled in December 2016[5] before two delays to July 2019.[6][2]

Primary payload

NASA has contracted for the CRS-18 mission from SpaceX and therefore determines the primary payload, date/time of launch, and orbital parameters for the Dragon space capsule. It will carry the third International Docking Adapter (IDA-3).[7]

See also

References

  1. ^ https://twitter.com/SpaceX/status/1154155687636717568
  2. ^ a b "Launch Schedule". Spaceflight Now. 19 July 2019. Retrieved 19 July 2019.
  3. ^ @SpaceX (19 July 2019). "The Dragon spacecraft supporting this mission previously visited the @space_station in April 2015 and December 2017" (Tweet) – via Twitter.
  4. ^ de Selding, Peter B. (24 February 2016). "SpaceX wins 5 new space station cargo missions in NASA contract estimated at $700 million". Space News. Retrieved 24 February 2016.
  5. ^ NASA Office of Inspector General (June 28, 2016). NASA’s Response to SpaceX’s June 2015 Launch Failure: Impacts on Commercial Resupply of the International Space Station (PDF) (Report). NASA Office of Inspector General. p. 13. Retrieved 2016-07-18.
  6. ^ "Upcoming Missions". SpaceXNow.com. Retrieved 31 May 2018.
  7. ^ Pietrobon, Steven (August 20, 2018). "United States Commercial ELV Launch Manifest". Retrieved August 21, 2018.