Jump to content

Draft:Boom Overture Superfactory

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by 24.152.144.132 (talk) at 23:33, 12 June 2024 (Submitting using AfC-submit-wizard). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Overture Superfactory
General information
StatusUnder construction
TypeManufacturing facility
LocationPiedmont Triad International Airport, Greensboro, North Carolina, United States
Groundbreaking2022
Construction startedJanuary 2023
Estimated completion2024
Technical details
Floor area400,000 sq ft (37,000 m2)

The Boom Overture Superfactory is a manufacturing facility currently under construction at the Piedmont Triad International Airport in Greensboro, North Carolina. When completed, the site will serve as a production facility for the Boom Overture supersonic transport. First announced by Boom Technology in January 2022, groundbreaking commenced later that year, with construction on the facility beginning in January of 2023. It is set for completion in 2024.[1]

References

  1. ^ Niles, Russ (31 January 2022). "Boom Picks Greensboro For Factory". AVweb. Retrieved 2 February 2022.