Jump to content

SpaceX CRS-18

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by PSR B1937+21 (talk | contribs) at 08:42, 20 July 2016 (→‎Primary payload). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

SpaceX CRS-18
Artist rendering of the SpaceX Dragon spacecraft being berthed to ISS
Mission typeISS resupply
OperatorSpaceX
COSPAR ID2019-044A Edit this at Wikidata
SATCAT no.44446Edit this on Wikidata
Spacecraft properties
SpacecraftDragon C20
Spacecraft typeDragon CRS
ManufacturerSpaceX
Dry mass4,200 kg (9,300 lb)
DimensionsHeight: 6.1 m (20 ft)
Diameter: 3.7 m (12 ft)
Start of mission
Launch datePlanned: December 2018
RocketFalcon 9
Launch siteCape Canaveral SLC-40
ContractorSpaceX
Orbital parameters
Reference systemGeocentric
RegimeLow Earth
Inclination51.6 degrees
EpochPlanned
Berthing at ISS
Berthing portHarmony nadir or Unity nadir
RMS capturePlanned: December 2018
Berthing datePlanned: December 2018

SpaceX CRS-18, also known as SpX-18, is a cargo resupply mission to the International Space Station currently manifested to be launched on December 2018.[1][2] The mission was contracted by NASA and is flown by SpaceX.

Launch schedule history

On February 2016, it was announced that NASA had awarded a contract extension to SpaceX for five CRS additional missions (CRS-16 to CRS-20).[3] As of June 2016, a NASA Inspector General report had this mission manifested for December 2018.[2]

Primary payload

NASA has contracted for the CRS-18 mission from SpaceX and therefore determines the primary payload, date/time of launch, and orbital parameters for the Dragon space capsule. According to a 2016 presentation, the external payload manifested for this flights is GEDI.[4]

See Also

References

  1. ^ Krebs, Gunter Dirk (2016-07-18). "Dragon C2, CRS-1,... CRS-20 (SpX 1,... 20)". Gunter's Space Page. Retrieved 2016-07-19.
  2. ^ a b NASA Office of Inspector General (June 28, 2016). NASA’s Response to SpaceX’s June 2015 Launch Failure: Impacts on Commercial Resupply of the International Space Station (PDF) (Report). NASA Office of Inspector General. p. 13. Retrieved 2016-07-18.
  3. ^ de Selding, Peter B. (24 February 2016). "SpaceX wins 5 new space station cargo missions in NASA contract estimated at $700 million". Space News. Retrieved 24 February 2016.
  4. ^ Kenol, Jules; Love, John (May 17, 2016). Research Capability of ISS for a Wide Spectrum of Science Disciplines, Including Materials Science (PDF). Materials in the Space Environment Workshop, Italian Space Agency, Rome.