Green upgrading of SPring-8 to produce stable, ultrabrilliant hard X-ray beams

J Synchrotron Radiat. 2024 Nov 1. doi: 10.1107/S1600577524008348. Online ahead of print.

Abstract

SPring-8-II is a major upgrade project of SPring-8 that was inaugurated in October 1997 as a third-generation synchrotron radiation light source. This upgrade project aims to achieve three goals simultaneously: achievement of excellent light source performance, refurbishment of aged systems, and significant reduction in power consumption for the entire facility. A small emittance of 50 pm rad will be achieved by (1) replacing the existing double-bend lattice structure with a five-bend achromat one, (2) lowering the stored beam energy from 8 to 6 GeV, (3) increasing the horizontal damping partition number from 1 to 1.3, and (4) enhancing horizontal radiation damping by installing damping wigglers in long straight sections. The use of short-period in-vacuum undulators allows ultrabrilliant X-rays to be provided while keeping a high-energy spectral range even at the reduced electron-beam energy of 6 GeV. To reduce power consumption, the dedicated, aged injector system has been shut down and the high-performance linear accelerator of SACLA, a compact X-ray free-electron laser (XFEL) facility, is used as the injector of the ring in a time-shared manner. This allows the simultaneous operation of XFEL experiments at SACLA and full/top-up injection of the electron beam into the ring. This paper overviews the concept of the SPring-8-II project, the system design of the light source and the details of the accelerator component design.

Keywords: accelerator; low emittance; low-emittance storage ring; next generation light source; sustainability.