From the course: Investment Evaluation

Schalten Sie den kompletten Kurs noch heute frei

Join today to access over 23,300 courses taught by industry experts.

Challenge 6: Choose a project based on NPV, IRR, and payback period

Challenge 6: Choose a project based on NPV, IRR, and payback period - Microsoft Excel Tutorial

From the course: Investment Evaluation

Challenge 6: Choose a project based on NPV, IRR, and payback period

"

- [Instructor] Welcome to your sixth and final challenge in this course. In this challenge, I'll present to you a set of data for two different projects, which you can find in exercise file 04_11_Challenge6. From the set of data, you'll need to determine the NPV, IRR, and Payback Period for each project. After that, determine whether you'd accept each project on its own. Then, determine which of the projects you would choose between the two. The challenge should take approximately five minutes. Good luck.

Inhalt