Professional Documents
Culture Documents
The Los Angeles Streetcar: Environmental Assessment
The Los Angeles Streetcar: Environmental Assessment
1
PROJECT SUMMARY & BACKGROUND
2
PROJECT SUMMARY
• 3.8-mile loop
• Broadway – 11th Street – Figueroa St -
7th Street – Hill Street
• Option for Grand Ave extension
• Frequency of service
• 7-minute peak hour headways
• 10-minute and 15-minute rest of day
3
STREETCAR 101
• Smaller than light-rail;
street-running vehicles
• Quiet, sustainable, accessible,
and high-capacity
• First/last-mile connections to regional
transit & activity centers
• Catalyzes and complements complete
streets investments (Broadway,
MyFigueroa, Pershing Square, etc.)
• Promotes highest and best use of
adjacent land
4
WHY DOWNTOWN?
• Center of regional transit network
• 4 Metro Rail lines
• Dozens of Metro Bus lines
• DASH, Commuter Express, etc.
5
BACKGROUND
• 2006: Feasibility Study (CRA/City)
• 2009: LA Streetcar, Inc. established
• 2012: FTA Alternatives Analysis (Metro), $62.5M Community Facilities District vote
• 2013: City commits $295M to operate streetcar for 30 years, hires Project Manager
• 2014: FTA Project Development
• 2015: Independent Cost Estimate (AECOM)
• 2016: Certification of Environmental Impact Report (EIR), 30% Preliminary Engineering,
Independent Cost Estimate (LABOE)
• 2018: Federal Transit Administration (FTA) Conducts Environmental Assessment to
Prepare and Support a Finding of No Significant Impact (FONSI)
6
ENVIRONMENTAL ASSESSMENT
7
ENVIRONMENTAL PROCESS
• EIR (CEQA – California Environmental Quality Act)
• Notice of Preparation: January 3, 2013
• NOP/Scoping Period (Public Review Period ): January 3 to February 1, 2013
• Scoping Meeting: January 23, 2013
• Notice of Availability: June 24 , 2016
• Public Review Period: June 24 to August 8, 2016
• Final EIR: Fall 2016
• Council Certification: November 2016
• Environmental Assessment (NEPA – National Environmental Policy Act)
• Notice of Availability: July 23, 2018
• Public Review Period: July 23, 2018 to August 21, 2018
• Public Comment Hearing: August 2, 2018
• FTA Finding of No Significant Impact: Fall 2018 (expected)
8
PROJECT ALTERNATIVES
• Alternative 1: No Build Alternative
• Alternative 2: 7th Street with Option for Grand Avenue Extension
9
ALT. 2
10
MAINTENANCE AND STORAGE FACILITY
• A Maintenance and Storage Facility (MSF) would be built for a place to store
streetcars overnight, clean vehicles, perform light maintenance, and provide office
space for streetcar staff
11
POTENTIAL MSF SITES
12
STREETCAR OPERATIONS
13
TOPICS ADDRESSED IN NEPA
ENVIRONMENTAL ASSESSMENT
• Air Quality • Land Use and Zoning
• Community Effects • Noise and Vibration
• Cultural Resources • Safety and Security
• Energy Resources • Transportation and Traffic
• Environmental Justice • Visual Quality
• 4(f) Resources (Parks, Recreation, • Construction
Historic Resources) • Indirect and Cumulative Effects
• Greenhouse Gas (GHG) Emissions
• Land Acquisition, Displacements, and
Fiscal Impacts
14
RESOURCES OF NO CONCERN BRIEFLY ADDRESSED
IN NEPA ENVIRONMENTAL ASSESSMENT
• Coastal Zones
• Ecologically Sensitive Areas
• Endangered and/or Threatened Plan and Animal Species
• Flood Plains
• Geology, Soils, and Seismicity (Operations)
• Hazardous Materials (Operations)
• Section 6(f) Resources (Water Conservation Funded Parks and Recreation)
• Water Quality and Hydrology (Operations)
• Wetlands and Navigable Waterways
• Wild and Scenic Rivers
15
ADVERSE EFFECTS BEFORE MITIGATION
• Environmental Justice • Visual Quality
• Noise and Vibration • Viewer Response
• Hazardous Materials • Construction
• Visual Quality • Air Quality and Climate Change
• Land Acquisition, Displacement and • Biological Resources
Fiscal Impacts • Environmental Justice
• Land Use and Zoning • Geology, Soils, and Seismicity
• Noise and Vibration • Hazardous Materials
• Noise • Land Acquisition, Displacements, and Fiscal Impacts
• Vibration • Noise & Vibration
• Safety and Security • Safety and Security
• Safety • Transportation and Traffic
• Visual Quality
16
ADVERSE EFFECTS AFTER MITIGATION
• Potential Noise and Safety adverse effects would be substantially reduced
with avoidance, minimization or mitigation measures
17
ENVIRONMENTAL ASSESSMENT PUBLIC REVIEW/COMMENT
All comments must be submitted in writing by August 21, 2018 via email or regular mail to:
18
NEXT STEPS
• Solicit public comments on the environmental
analyses in the Environmental Assessment
19
PUBLIC COMMENT
PERIOD
• Public comments are limited to
two (2) minutes per person
20 THANK YOU!!!