Abdulrahman Hassan Ahmed: Technical Office Engineer
Abdulrahman Hassan Ahmed: Technical Office Engineer
Professional skills
Reporting project status through daily, weekly and monthly progress reports.
Progress calculation and Invoicing as per Contract’s terms and conditions.
Management of project documents (Drawings, transmittals, letters…etc.)
Development of Material Control System including Packing-List, Material Requests, and Material
Releases reflection on original quantities of BOQ.
Establish a control system for all the project to maintain and develop all the reports and Invoice
data.
Control and manage all the Piping activities in phase of MTO, construction, testing and pre-
commissioning.
Prepare and review Hydro-test Packages in collaboration with QC Department.
Preparing lifting plans which involves (Crane selection, Crane positioning, crane maneuvering,
selection of rigging tools, drafting related drawings and securing calibration certificates )
Creating Method of statements for construction according to erection manuals and project plan
General technical support for execution team.
Coordination with site engineers for best execution scenarios according to project plan
Work History
- Create and development of the Progress Control sheet along the Project.
- Conclude actual site information to a daily, Weekly and monthly progress reports
for the Clients and top management.
- Monitor Engineering Drawings & Documents to ensure full contractual scope
coverage.
- Control and manage all the Piping activities in phase of MTO, construction, and
Hydro-Test.
- Monitor additional works due to site requirements and client requests.
- Invoicing and progress calculation
1
- Monitoring and Controlling all the Progress in Site.
- Preparing look ahead plans.
- Highlight Assembly & Erection Piping Work-Fronts based on Received Material
Status and Technical Documents.
- Follow up and arrange with Sub-Contractors.
- Prepare and review Hydro-test Packages in collaboration with QC Department.
Jan 2016 – July 2017 at MEC (Mariout for Engineering & Construction)
Projects:
El-Burullus 4800 MW Combined Cycle Power Plant. (April 2016 – Nov 2016)
South Helwan 3*650 MW Super Critical Power Plant. CP-105 (Nov 2016 – July 2017)
Responsibilities:
- Development of Progress Control Sheets.
- Conclude actual site information to a Daily, Weekly and Monthly Report with
updated photos.
- Making S Curve for each WBS and for total Scope.
- Issue Monthly Invoices including Extra-work.
- Making Activity hours analysis for each month.
- Updated General and Detailed schedule.
- Highlight Assembly & Erection Work-Fronts based on Received Material Status
and Technical Documents.
- Issue Lifting, Rotation, and Transportation Plans.
- Issue Request for Information (RFI’s).
Jan 2014 – Jan 2016 at Essalam Latex and Plastics Works, Borg Al-Arab
Project Engineer
Responsibilities:
- Production Planning (Scheduling & Synchronization).
- Following up raw materials and finished products stocks.
- Directing and managing a team of 3 foremen and 50 workers.
Courses
PRMG -010 (Project Planning and Control Techniques) American University of Cairo.
PMP exam preparation course - March 2018 at CMCS Egypt.
Planning & Scheduling Using Primavera P6 – April 2017 at CMCS Egypt
2
Education
B.Sc. Mechanical Engineering, Alexandria University. 2013
Languages
Arabic: Native.
English: Fluent.
Personal data
Birth date: 07/11/1987.
Nationality: Egyptian.
Military status: Exempted.