Mahraj Building Maintenance LLC

Method of Statement

General Information
DTOTBPR 5000191 Refurbishment of swimming pool deck
Project Name: Project Number: DO/MBM/028/924
area tiles at Hayya swimming pool
Client : EMAAR Location: Dubai
Contractor/Sub-contractor: Mahraj Building Maintenance LLC
Resources Required
Project Site
Project
General Site Engineer Site Safety
Manager Supervisor Workers
Manager Engineer coordinator Officer
Personnel Required: (Civil)
(civil) (Civil)
Mr. Joy Mr. Ishtiaq
Mr. Jibran Mr. Ajay Mrs. Deepthi Mr. Ranjith
Nambadan’ Ahmad
Safety barricades, Cutter, cutting tool, Self levelling
Materials Required:
laser, Hammer.
Machinery/Equipment
Cart away truck
Required:
Sequence of work
1) Replacement of Existing drain grating channels and Manhole covers.
 Purchasing the material as per the approved sample and as per the required quantity

 Storage of material whichever is easy to shift to the work place

 Barricading the area with required safety precautionary measures and safety signages
.
 Switch off the power connections and disconnection of the water lines

1 of 3
Page
Mahraj Building Maintenance LLC
Method of Statement

 Drain the water to the designated place

 Protect the adjacent sides with proper materials.

 Arrange proper PPE for the workers.

 Removal of existing tiles using machineries and tools.

 Shifting the material to the designated area

 Taking care about the drain points, lights and other services.

 Application of waterproofing after cleaning as per the manufacturers recommondation

 Installation of tiles using appropriate grout

 Application of grouting the joints.

 Clearing the area and demobilization.

Personal Protective Equipment Required (Please use PPE as per Site requirements)

R R R N R Ear R R N N
Safety Face Dust Half-face
Coverall e Hard hat e e Goggles / Gloves e Protectio e e / Harness /
Shoes shield Mask Mask
q q q A q n q q A A
Precautions to be Taken
Mahraj Building Maintenance LLC
Method of Statement

 Tool Box Talk to be carried out prior start to the work, Make Sure All Equipment Properly Working Condition, PPE must on the
site
 Site engineer and Safety Officer is available on site at all the times until the completion of project (as Per site requirement’s)

 Daily site inspections before work commences should be carried out to look for indications of any situation that could result
in cave-ins and indications of failure of protective systems.

Page 2 of 3
Mahraj Building Maintenance LLC
Method of Statement

 All the Mahraj and sub-contractor’s employees recognize that safety is an integral part of their job duties and responsible for
preventing unnecessary injuries ,All the workers and supervisors will be committed to carry out smooth operation at all the time
in the site, well briefed by safety representative about procedures of the premises and safety environment.

 All employees are to be a properly and thoroughly trained in safe work practices and are to understand importance placed
on working safely every day

 Provide sufficient lighting during hours of darkness to allow safe working conditions

 Ensure that proper housekeeping will be in place at all the time, keep work area free from tripping hazards and debris

APPROVAL OF METHOD STATEMENT

Name: Mr. Ishtiaq Ahmad Name: Mr. Ranjith

Designation: Project Manager Designation: Safety Officer


Date: 5/10/22 Date:
5/10/22

Signature: Signature:

Page 3 of 3