Jump to content

Examine individual changes

This page allows you to examine the variables generated by the Edit Filter for an individual change.

Variables generated for this change

VariableValue
Whether or not the edit is marked as minor (no longer in use) (minor_edit)
false
Edit count of the user (user_editcount)
43363
Name of the user account (user_name)
'Cloudbound'
Age of the user account (user_age)
360022733
Groups (including implicit) the user is in (user_groups)
[ 0 => 'autoreviewer', 1 => 'extendedconfirmed', 2 => 'filemover', 3 => 'reviewer', 4 => 'rollbacker', 5 => '*', 6 => 'user', 7 => 'autoconfirmed' ]
Global groups that the user is in (global_user_groups)
[]
Whether or not a user is editing through the mobile interface (user_mobile)
false
user_wpzero
false
Page ID (page_id)
0
Page namespace (page_namespace)
0
Page title without namespace (page_title)
'West London Waste Authority'
Full page title (page_prefixedtitle)
'West London Waste Authority'
Last ten users to contribute to the page (page_recent_contributors)
''
Action (action)
'edit'
Edit summary/reason (summary)
'started new article'
Old content model (old_content_model)
''
New content model (new_content_model)
'wikitext'
Old page wikitext, before the edit (old_wikitext)
''
New page wikitext, after the edit (new_wikitext)
'{{Use British English|date=January 2017}} {{Infobox government agency | agency_name = West London Waste Authority | type = agency | logo = | logo_width = | logo_caption = | picture = | picture_width = | picture_caption = | formed = 1986 | preceding1 = [[Greater London Council]] | preceding2 = <!-- up to |preceding6= --> | dissolved = | superseding = | agency_type = | jurisdiction = [[London boroughs]] of [[London Borough of Brent|Brent]], [[London Borough of Ealing|Ealing]], [[London Borough of Harrow|Harrow]], [[London Borough of Hillingdon|Hillingdon]], [[London Borough of Hounslow|Hounslow]], [[London Borough of Richmond upon Thames|Richmond upon Thames]] | headquarters = Civic Centre, Lampton Road, Hounslow, TW3 4DN | region_code = | motto = | employees = | budget = | chief1_name = Councillor Bassam Mahfouz ([[Labour Party (UK)|Lab]]) | chief1_position = Chair of Authority | chief2_name = Emma Beal | chief2_position = Managing Director<ref>{{cite news|title=Beal takes over as MD of WLWA|url=http://www.recyclingwasteworld.co.uk/people/beal-takes-over-as-md-of-wlwa/146182/|accessdate=3 January 2017|work=Recycling & Waste World|date=27 September 2016}}</ref> | parent_department = | parent_agency = | child1_agency = | child2_agency = <!-- up to |child25_agency= --> | keydocument1 = <!-- up to |keydocument6= --> | website = {{URL|www.westlondonwaste.gov.uk}} | map = | map_width = | map_caption = | footnotes = | embed = }} The '''West London Waste Authority''' is the [[Statutory authority|statutory body]] responsible for waste disposal in the London boroughs of [[London Borough of Brent|Brent]], [[London Borough of Ealing|Ealing]], [[London Borough of Harrow|Harrow]], [[London Borough of Hillingdon|Hillingdon]], [[London Borough of Hounslow|Hounslow]] and [[London Borough of Richmond upon Thames|Richmond upon Thames]]. The authority was formed in 1986, taking over functions previously held by the [[Greater London Council]], and is overseen by an elected councillor from each of the boroughs in which it operates. ==Waste processing== The majority (96%) of [[residual waste]] (waste that cannot be recycled) produced in the area that the authority covers is sent by rail to be [[Incineration|incinerated]] at Energy Recovery Facilities, providing energy for the [[National Grid (Great Britain)|National Grid]].<ref>{{cite news|title=London landfill waste to be burnt near Bristol|url=http://www.bbc.co.uk/news/uk-england-22432435|accessdate=3 January 2017|publisher=BBC News|date=7 May 2013}}</ref> Most of this is processed at [[SITA UK]]'s plant at [[Severnside]],<ref>{{cite news|title=1.4bn Contract for SITA to Process London Waste at Severnside Waste to Energy Plant|url=https://waste-management-world.com/a/1-4bn-contract-for-sita-to-process-london-waste-at-severnside-waste-to-energy-plant|accessdate=3 January 2017|work=Waste Management World|date=30 November 2013}}</ref> the remainder is processed by [[Viridor]] at its facility near [[Heathrow Airport]]. The remaining waste is sent to [[landfill]]. SITA UK has provided the service to the authority since it signed a £760 million [[public-private partnership]] contract in November 2013 to last 25 years.<ref>{{cite web|title=SITA UK signs £760 million contract with West London Waste Authority |url=http://www.sita.co.uk/news-and-views/press-releases/sita-uk-signs-a3760-million-contract-with-west |accessdate=3 January 2017|publisher=SITA UK|date=28 November 2013}}</ref> ==References== {{reflist}} ==External links== * {{official website|http://westlondonwaste.gov.uk/}}'
Unified diff of changes made by edit (edit_diff)
'@@ -1,2 +1,52 @@ +{{Use British English|date=January 2017}} +{{Infobox government agency +| agency_name = West London Waste Authority +| type = agency +| logo = +| logo_width = +| logo_caption = +| picture = +| picture_width = +| picture_caption = +| formed = 1986 +| preceding1 = [[Greater London Council]] +| preceding2 = <!-- up to |preceding6= --> +| dissolved = +| superseding = +| agency_type = +| jurisdiction = [[London boroughs]] of [[London Borough of Brent|Brent]], [[London Borough of Ealing|Ealing]], [[London Borough of Harrow|Harrow]], [[London Borough of Hillingdon|Hillingdon]], [[London Borough of Hounslow|Hounslow]], [[London Borough of Richmond upon Thames|Richmond upon Thames]] +| headquarters = Civic Centre, Lampton Road, Hounslow, TW3 4DN +| region_code = +| motto = +| employees = +| budget = +| chief1_name = Councillor Bassam Mahfouz ([[Labour Party (UK)|Lab]]) +| chief1_position = Chair of Authority +| chief2_name = Emma Beal +| chief2_position = Managing Director<ref>{{cite news|title=Beal takes over as MD of WLWA|url=http://www.recyclingwasteworld.co.uk/people/beal-takes-over-as-md-of-wlwa/146182/|accessdate=3 January 2017|work=Recycling & Waste World|date=27 September 2016}}</ref> +| parent_department = +| parent_agency = +| child1_agency = +| child2_agency = <!-- up to |child25_agency= --> +| keydocument1 = <!-- up to |keydocument6= --> +| website = {{URL|www.westlondonwaste.gov.uk}} +| map = +| map_width = +| map_caption = +| footnotes = +| embed = +}} +The '''West London Waste Authority''' is the [[Statutory authority|statutory body]] responsible for waste disposal in the London boroughs of [[London Borough of Brent|Brent]], [[London Borough of Ealing|Ealing]], [[London Borough of Harrow|Harrow]], [[London Borough of Hillingdon|Hillingdon]], [[London Borough of Hounslow|Hounslow]] and [[London Borough of Richmond upon Thames|Richmond upon Thames]]. The authority was formed in 1986, taking over functions previously held by the [[Greater London Council]], and is overseen by an elected councillor from each of the boroughs in which it operates. + +==Waste processing== +The majority (96%) of [[residual waste]] (waste that cannot be recycled) produced in the area that the authority covers is sent by rail to be [[Incineration|incinerated]] at Energy Recovery Facilities, providing energy for the [[National Grid (Great Britain)|National Grid]].<ref>{{cite news|title=London landfill waste to be burnt near Bristol|url=http://www.bbc.co.uk/news/uk-england-22432435|accessdate=3 January 2017|publisher=BBC News|date=7 May 2013}}</ref> Most of this is processed at [[SITA UK]]'s plant at [[Severnside]],<ref>{{cite news|title=1.4bn Contract for SITA to Process London Waste at Severnside Waste to Energy Plant|url=https://waste-management-world.com/a/1-4bn-contract-for-sita-to-process-london-waste-at-severnside-waste-to-energy-plant|accessdate=3 January 2017|work=Waste Management World|date=30 November 2013}}</ref> the remainder is processed by [[Viridor]] at its facility near [[Heathrow Airport]]. The remaining waste is sent to [[landfill]]. + +SITA UK has provided the service to the authority since it signed a £760 million [[public-private partnership]] contract in November 2013 to last 25 years.<ref>{{cite web|title=SITA UK signs £760 million contract with West London Waste Authority |url=http://www.sita.co.uk/news-and-views/press-releases/sita-uk-signs-a3760-million-contract-with-west |accessdate=3 January 2017|publisher=SITA UK|date=28 November 2013}}</ref> + +==References== +{{reflist}} + +==External links== +* {{official website|http://westlondonwaste.gov.uk/}} '
New page size (new_size)
3768
Old page size (old_size)
0
Size change in edit (edit_delta)
3768
Lines added in edit (added_lines)
[ 0 => '{{Use British English|date=January 2017}}', 1 => '{{Infobox government agency', 2 => '| agency_name = West London Waste Authority', 3 => '| type = agency', 4 => '| logo = ', 5 => '| logo_width = ', 6 => '| logo_caption = ', 7 => '| picture = ', 8 => '| picture_width = ', 9 => '| picture_caption = ', 10 => '| formed = 1986', 11 => '| preceding1 = [[Greater London Council]]', 12 => '| preceding2 = <!-- up to |preceding6= -->', 13 => '| dissolved = ', 14 => '| superseding = ', 15 => '| agency_type =', 16 => '| jurisdiction = [[London boroughs]] of [[London Borough of Brent|Brent]], [[London Borough of Ealing|Ealing]], [[London Borough of Harrow|Harrow]], [[London Borough of Hillingdon|Hillingdon]], [[London Borough of Hounslow|Hounslow]], [[London Borough of Richmond upon Thames|Richmond upon Thames]]', 17 => '| headquarters = Civic Centre, Lampton Road, Hounslow, TW3 4DN', 18 => '| region_code = ', 19 => '| motto = ', 20 => '| employees = ', 21 => '| budget = ', 22 => '| chief1_name = Councillor Bassam Mahfouz ([[Labour Party (UK)|Lab]])', 23 => '| chief1_position = Chair of Authority', 24 => '| chief2_name = Emma Beal', 25 => '| chief2_position = Managing Director<ref>{{cite news|title=Beal takes over as MD of WLWA|url=http://www.recyclingwasteworld.co.uk/people/beal-takes-over-as-md-of-wlwa/146182/|accessdate=3 January 2017|work=Recycling & Waste World|date=27 September 2016}}</ref>', 26 => '| parent_department = ', 27 => '| parent_agency = ', 28 => '| child1_agency = ', 29 => '| child2_agency = <!-- up to |child25_agency= -->', 30 => '| keydocument1 = <!-- up to |keydocument6= -->', 31 => '| website = {{URL|www.westlondonwaste.gov.uk}}', 32 => '| map = ', 33 => '| map_width = ', 34 => '| map_caption = ', 35 => '| footnotes = ', 36 => '| embed =', 37 => '}}', 38 => 'The '''West London Waste Authority''' is the [[Statutory authority|statutory body]] responsible for waste disposal in the London boroughs of [[London Borough of Brent|Brent]], [[London Borough of Ealing|Ealing]], [[London Borough of Harrow|Harrow]], [[London Borough of Hillingdon|Hillingdon]], [[London Borough of Hounslow|Hounslow]] and [[London Borough of Richmond upon Thames|Richmond upon Thames]]. The authority was formed in 1986, taking over functions previously held by the [[Greater London Council]], and is overseen by an elected councillor from each of the boroughs in which it operates.', 39 => false, 40 => '==Waste processing==', 41 => 'The majority (96%) of [[residual waste]] (waste that cannot be recycled) produced in the area that the authority covers is sent by rail to be [[Incineration|incinerated]] at Energy Recovery Facilities, providing energy for the [[National Grid (Great Britain)|National Grid]].<ref>{{cite news|title=London landfill waste to be burnt near Bristol|url=http://www.bbc.co.uk/news/uk-england-22432435|accessdate=3 January 2017|publisher=BBC News|date=7 May 2013}}</ref> Most of this is processed at [[SITA UK]]'s plant at [[Severnside]],<ref>{{cite news|title=1.4bn Contract for SITA to Process London Waste at Severnside Waste to Energy Plant|url=https://waste-management-world.com/a/1-4bn-contract-for-sita-to-process-london-waste-at-severnside-waste-to-energy-plant|accessdate=3 January 2017|work=Waste Management World|date=30 November 2013}}</ref> the remainder is processed by [[Viridor]] at its facility near [[Heathrow Airport]]. The remaining waste is sent to [[landfill]].', 42 => false, 43 => 'SITA UK has provided the service to the authority since it signed a £760 million [[public-private partnership]] contract in November 2013 to last 25 years.<ref>{{cite web|title=SITA UK signs £760 million contract with West London Waste Authority |url=http://www.sita.co.uk/news-and-views/press-releases/sita-uk-signs-a3760-million-contract-with-west |accessdate=3 January 2017|publisher=SITA UK|date=28 November 2013}}</ref>', 44 => false, 45 => '==References==', 46 => '{{reflist}}', 47 => false, 48 => '==External links==', 49 => '* {{official website|http://westlondonwaste.gov.uk/}}' ]
Lines removed in edit (removed_lines)
[]
New page wikitext, pre-save transformed (new_pst)
'{{Use British English|date=January 2017}} {{Infobox government agency | agency_name = West London Waste Authority | type = agency | logo = | logo_width = | logo_caption = | picture = | picture_width = | picture_caption = | formed = 1986 | preceding1 = [[Greater London Council]] | preceding2 = <!-- up to |preceding6= --> | dissolved = | superseding = | agency_type = | jurisdiction = [[London boroughs]] of [[London Borough of Brent|Brent]], [[London Borough of Ealing|Ealing]], [[London Borough of Harrow|Harrow]], [[London Borough of Hillingdon|Hillingdon]], [[London Borough of Hounslow|Hounslow]], [[London Borough of Richmond upon Thames|Richmond upon Thames]] | headquarters = Civic Centre, Lampton Road, Hounslow, TW3 4DN | region_code = | motto = | employees = | budget = | chief1_name = Councillor Bassam Mahfouz ([[Labour Party (UK)|Lab]]) | chief1_position = Chair of Authority | chief2_name = Emma Beal | chief2_position = Managing Director<ref>{{cite news|title=Beal takes over as MD of WLWA|url=http://www.recyclingwasteworld.co.uk/people/beal-takes-over-as-md-of-wlwa/146182/|accessdate=3 January 2017|work=Recycling & Waste World|date=27 September 2016}}</ref> | parent_department = | parent_agency = | child1_agency = | child2_agency = <!-- up to |child25_agency= --> | keydocument1 = <!-- up to |keydocument6= --> | website = {{URL|www.westlondonwaste.gov.uk}} | map = | map_width = | map_caption = | footnotes = | embed = }} The '''West London Waste Authority''' is the [[Statutory authority|statutory body]] responsible for waste disposal in the London boroughs of [[London Borough of Brent|Brent]], [[London Borough of Ealing|Ealing]], [[London Borough of Harrow|Harrow]], [[London Borough of Hillingdon|Hillingdon]], [[London Borough of Hounslow|Hounslow]] and [[London Borough of Richmond upon Thames|Richmond upon Thames]]. The authority was formed in 1986, taking over functions previously held by the [[Greater London Council]], and is overseen by an elected councillor from each of the boroughs in which it operates. ==Waste processing== The majority (96%) of [[residual waste]] (waste that cannot be recycled) produced in the area that the authority covers is sent by rail to be [[Incineration|incinerated]] at Energy Recovery Facilities, providing energy for the [[National Grid (Great Britain)|National Grid]].<ref>{{cite news|title=London landfill waste to be burnt near Bristol|url=http://www.bbc.co.uk/news/uk-england-22432435|accessdate=3 January 2017|publisher=BBC News|date=7 May 2013}}</ref> Most of this is processed at [[SITA UK]]'s plant at [[Severnside]],<ref>{{cite news|title=1.4bn Contract for SITA to Process London Waste at Severnside Waste to Energy Plant|url=https://waste-management-world.com/a/1-4bn-contract-for-sita-to-process-london-waste-at-severnside-waste-to-energy-plant|accessdate=3 January 2017|work=Waste Management World|date=30 November 2013}}</ref> the remainder is processed by [[Viridor]] at its facility near [[Heathrow Airport]]. The remaining waste is sent to [[landfill]]. SITA UK has provided the service to the authority since it signed a £760 million [[public-private partnership]] contract in November 2013 to last 25 years.<ref>{{cite web|title=SITA UK signs £760 million contract with West London Waste Authority |url=http://www.sita.co.uk/news-and-views/press-releases/sita-uk-signs-a3760-million-contract-with-west |accessdate=3 January 2017|publisher=SITA UK|date=28 November 2013}}</ref> ==References== {{reflist}} ==External links== * {{official website|http://westlondonwaste.gov.uk/}}'
Parsed HTML source of the new revision (new_html)
'<table class="infobox" style="width:22em"> <caption>West London Waste Authority</caption> <tr> <th colspan="2" style="text-align:center;background-color: #efefef">Agency overview</th> </tr> <tr> <th scope="row">Formed</th> <td>1986</td> </tr> <tr> <th scope="row">Preceding agency</th> <td> <div class="plainlist"> <ul> <li style="text-indent: -1em; padding-left: 1em;"><a href="/wiki/Greater_London_Council" title="Greater London Council">Greater London Council</a></li> </ul> </div> </td> </tr> <tr> <th scope="row">Jurisdiction</th> <td><a href="/wiki/London_boroughs" title="London boroughs">London boroughs</a> of <a href="/wiki/London_Borough_of_Brent" title="London Borough of Brent">Brent</a>, <a href="/wiki/London_Borough_of_Ealing" title="London Borough of Ealing">Ealing</a>, <a href="/wiki/London_Borough_of_Harrow" title="London Borough of Harrow">Harrow</a>, <a href="/wiki/London_Borough_of_Hillingdon" title="London Borough of Hillingdon">Hillingdon</a>, <a href="/wiki/London_Borough_of_Hounslow" title="London Borough of Hounslow">Hounslow</a>, <a href="/wiki/London_Borough_of_Richmond_upon_Thames" title="London Borough of Richmond upon Thames">Richmond upon Thames</a></td> </tr> <tr> <th scope="row">Headquarters</th> <td>Civic Centre, Lampton Road, Hounslow, TW3 4DN</td> </tr> <tr> <th scope="row">Agency executives</th> <td> <div class="plainlist"> <ul> <li>Councillor Bassam Mahfouz (<a href="/wiki/Labour_Party_(UK)" title="Labour Party (UK)">Lab</a>), Chair of Authority</li> <li>Emma Beal, Managing Director<sup id="cite_ref-1" class="reference"><a href="#cite_note-1">[1]</a></sup></li> </ul> </div> </td> </tr> <tr> <th scope="row">Website</th> <td><span class="url"><a rel="nofollow" class="external text" href="http://www.westlondonwaste.gov.uk">www<wbr />.westlondonwaste<wbr />.gov<wbr />.uk</a></span></td> </tr> </table> <p>The <b>West London Waste Authority</b> is the <a href="/wiki/Statutory_authority" title="Statutory authority">statutory body</a> responsible for waste disposal in the London boroughs of <a href="/wiki/London_Borough_of_Brent" title="London Borough of Brent">Brent</a>, <a href="/wiki/London_Borough_of_Ealing" title="London Borough of Ealing">Ealing</a>, <a href="/wiki/London_Borough_of_Harrow" title="London Borough of Harrow">Harrow</a>, <a href="/wiki/London_Borough_of_Hillingdon" title="London Borough of Hillingdon">Hillingdon</a>, <a href="/wiki/London_Borough_of_Hounslow" title="London Borough of Hounslow">Hounslow</a> and <a href="/wiki/London_Borough_of_Richmond_upon_Thames" title="London Borough of Richmond upon Thames">Richmond upon Thames</a>. The authority was formed in 1986, taking over functions previously held by the <a href="/wiki/Greater_London_Council" title="Greater London Council">Greater London Council</a>, and is overseen by an elected councillor from each of the boroughs in which it operates.</p> <h2><span class="mw-headline" id="Waste_processing">Waste processing</span><span class="mw-editsection"><span class="mw-editsection-bracket">[</span><a href="/w/index.php?title=West_London_Waste_Authority&amp;action=edit&amp;section=1" title="Edit section: Waste processing">edit</a><span class="mw-editsection-bracket">]</span></span></h2> <p>The majority (96%) of <a href="/wiki/Residual_waste" class="mw-redirect" title="Residual waste">residual waste</a> (waste that cannot be recycled) produced in the area that the authority covers is sent by rail to be <a href="/wiki/Incineration" title="Incineration">incinerated</a> at Energy Recovery Facilities, providing energy for the <a href="/wiki/National_Grid_(Great_Britain)" title="National Grid (Great Britain)">National Grid</a>.<sup id="cite_ref-2" class="reference"><a href="#cite_note-2">[2]</a></sup> Most of this is processed at <a href="/wiki/SITA_UK" title="SITA UK">SITA UK</a>'s plant at <a href="/wiki/Severnside" title="Severnside">Severnside</a>,<sup id="cite_ref-3" class="reference"><a href="#cite_note-3">[3]</a></sup> the remainder is processed by <a href="/wiki/Viridor" title="Viridor">Viridor</a> at its facility near <a href="/wiki/Heathrow_Airport" title="Heathrow Airport">Heathrow Airport</a>. The remaining waste is sent to <a href="/wiki/Landfill" title="Landfill">landfill</a>.</p> <p>SITA UK has provided the service to the authority since it signed a £760 million <a href="/wiki/Public-private_partnership" class="mw-redirect" title="Public-private partnership">public-private partnership</a> contract in November 2013 to last 25 years.<sup id="cite_ref-4" class="reference"><a href="#cite_note-4">[4]</a></sup></p> <h2><span class="mw-headline" id="References">References</span><span class="mw-editsection"><span class="mw-editsection-bracket">[</span><a href="/w/index.php?title=West_London_Waste_Authority&amp;action=edit&amp;section=2" title="Edit section: References">edit</a><span class="mw-editsection-bracket">]</span></span></h2> <div class="reflist" style="list-style-type: decimal;"> <ol class="references"> <li id="cite_note-1"><span class="mw-cite-backlink"><b><a href="#cite_ref-1">^</a></b></span> <span class="reference-text"><cite class="citation news"><a rel="nofollow" class="external text" href="http://www.recyclingwasteworld.co.uk/people/beal-takes-over-as-md-of-wlwa/146182/">"Beal takes over as MD of WLWA"</a>. <i>Recycling &amp; Waste World</i>. 27 September 2016<span class="reference-accessdate">. Retrieved <span class="nowrap">3 January</span> 2017</span>.</cite><span title="ctx_ver=Z39.88-2004&amp;rfr_id=info%3Asid%2Fen.wikipedia.org%3AWest+London+Waste+Authority&amp;rft.atitle=Beal+takes+over+as+MD+of+WLWA&amp;rft.date=2016-09-27&amp;rft.genre=article&amp;rft_id=http%3A%2F%2Fwww.recyclingwasteworld.co.uk%2Fpeople%2Fbeal-takes-over-as-md-of-wlwa%2F146182%2F&amp;rft.jtitle=Recycling+%26+Waste+World&amp;rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal" class="Z3988"><span style="display:none;">&#160;</span></span></span></li> <li id="cite_note-2"><span class="mw-cite-backlink"><b><a href="#cite_ref-2">^</a></b></span> <span class="reference-text"><cite class="citation news"><a rel="nofollow" class="external text" href="http://www.bbc.co.uk/news/uk-england-22432435">"London landfill waste to be burnt near Bristol"</a>. BBC News. 7 May 2013<span class="reference-accessdate">. Retrieved <span class="nowrap">3 January</span> 2017</span>.</cite><span title="ctx_ver=Z39.88-2004&amp;rfr_id=info%3Asid%2Fen.wikipedia.org%3AWest+London+Waste+Authority&amp;rft.atitle=London+landfill+waste+to+be+burnt+near+Bristol&amp;rft.date=2013-05-07&amp;rft.genre=article&amp;rft_id=http%3A%2F%2Fwww.bbc.co.uk%2Fnews%2Fuk-england-22432435&amp;rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal" class="Z3988"><span style="display:none;">&#160;</span></span></span></li> <li id="cite_note-3"><span class="mw-cite-backlink"><b><a href="#cite_ref-3">^</a></b></span> <span class="reference-text"><cite class="citation news"><a rel="nofollow" class="external text" href="https://waste-management-world.com/a/1-4bn-contract-for-sita-to-process-london-waste-at-severnside-waste-to-energy-plant">"1.4bn Contract for SITA to Process London Waste at Severnside Waste to Energy Plant"</a>. <i>Waste Management World</i>. 30 November 2013<span class="reference-accessdate">. Retrieved <span class="nowrap">3 January</span> 2017</span>.</cite><span title="ctx_ver=Z39.88-2004&amp;rfr_id=info%3Asid%2Fen.wikipedia.org%3AWest+London+Waste+Authority&amp;rft.atitle=1.4bn+Contract+for+SITA+to+Process+London+Waste+at+Severnside+Waste+to+Energy+Plant&amp;rft.date=2013-11-30&amp;rft.genre=article&amp;rft_id=https%3A%2F%2Fwaste-management-world.com%2Fa%2F1-4bn-contract-for-sita-to-process-london-waste-at-severnside-waste-to-energy-plant&amp;rft.jtitle=Waste+Management+World&amp;rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal" class="Z3988"><span style="display:none;">&#160;</span></span></span></li> <li id="cite_note-4"><span class="mw-cite-backlink"><b><a href="#cite_ref-4">^</a></b></span> <span class="reference-text"><cite class="citation web"><a rel="nofollow" class="external text" href="http://www.sita.co.uk/news-and-views/press-releases/sita-uk-signs-a3760-million-contract-with-west">"SITA UK signs £760 million contract with West London Waste Authority"</a>. SITA UK. 28 November 2013<span class="reference-accessdate">. Retrieved <span class="nowrap">3 January</span> 2017</span>.</cite><span title="ctx_ver=Z39.88-2004&amp;rfr_id=info%3Asid%2Fen.wikipedia.org%3AWest+London+Waste+Authority&amp;rft.btitle=SITA+UK+signs+%A3760+million+contract+with+West+London+Waste+Authority&amp;rft.date=2013-11-28&amp;rft.genre=unknown&amp;rft_id=http%3A%2F%2Fwww.sita.co.uk%2Fnews-and-views%2Fpress-releases%2Fsita-uk-signs-a3760-million-contract-with-west&amp;rft.pub=SITA+UK&amp;rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Abook" class="Z3988"><span style="display:none;">&#160;</span></span></span></li> </ol> </div> <h2><span class="mw-headline" id="External_links">External links</span><span class="mw-editsection"><span class="mw-editsection-bracket">[</span><a href="/w/index.php?title=West_London_Waste_Authority&amp;action=edit&amp;section=3" title="Edit section: External links">edit</a><span class="mw-editsection-bracket">]</span></span></h2> <ul> <li><span class="official-website"><span class="url"><a rel="nofollow" class="external text" href="http://westlondonwaste.gov.uk/">Official website</a></span></span></li> </ul> <!-- NewPP limit report Parsed by mw1196 Cached time: 20170103203150 Cache expiry: 2592000 Dynamic content: false CPU time usage: 0.120 seconds Real time usage: 0.162 seconds Preprocessor visited node count: 862/1000000 Preprocessor generated node count: 0/1500000 Post‐expand include size: 11860/2097152 bytes Template argument size: 1419/2097152 bytes Highest expansion depth: 12/40 Expensive parser function count: 1/500 Lua time usage: 0.056/10.000 seconds Lua memory usage: 2.49 MB/50 MB --> <!-- Transclusion expansion time report (%,ms,calls,template) 100.00% 150.721 1 - -total 34.91% 52.624 1 - Template:Infobox_government_agency 32.37% 48.794 1 - Template:Reflist 29.75% 44.841 1 - Template:Infobox 23.82% 35.896 3 - Template:Cite_news 16.17% 24.371 1 - Template:Official_website 15.07% 22.717 1 - Template:Use_British_English 7.84% 11.809 7 - Template:Unbulleted_list 5.91% 8.907 1 - Template:DMCA 5.02% 7.568 1 - Template:Dated_maintenance_category --> '
Whether or not the change was made through a Tor exit node (tor_exit_node)
0
Unix timestamp of change (timestamp)
1483475518