The Staunton Crossing Plan
ADV. MFG.
OFFICE/FLEX
RETAIL
Option 1
The Staunton Crossing Plan
ADV. MFG.
Option 2
The Staunton Crossing Plan
THE BIG PICTURE
1.9 MILLION SQUARE FEET OF ECONOMIC DEVELOPMENT
Use Type Total SF Use Type Tax Revenue Total Jobs Use Type Water Use Sewer Use Totals
Retail 15,000 Retail $16,000 60 Retail 1,500 GPD 1,200 GPD Square Feet 1,840,000
Tax Revenue $4,037,000
Office 605,000 Office $884,000 2,420 Office 60,000 GPD 36,300 GPD
Jobs 3,250
Adv. Mfg. 845,000 Adv. Mfg. $2,012,000 720 Adv. Mfg. 211,250 GPD 169,000 GPD
Water Use 460,250 GPD
Data 375,000 Data $1,125,000 50 Data 187,500 GPD 65,625 GPD Sewer Use 272,125 GPD
The Staunton Crossing Plan
THE BIG PICTURE
The Staunton Crossing Plan
THE BIG PICTURE
TABLE 1 TABLE 2 TABLE 3 MASTER PLAN
Sewer - Onsite
Design/Development Considerations
Sewer - Onsite
Design/Development Considerations
Sewer - Offsite
Design/Development Considerations
2019 2020 2021 2022 2023 2024 2025
RECOMMENDATIONS H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2
1. DEMOLISH BLDG
2. VDOT ROAD
3. BROWNFIELD GRANTS
4. ROI STUDY
5. TIER 4 READINESS
6. MARKETING PLAN
7. DESIGN GUIDELINES
8. COVENANTS
9. REAL ESTATE CONTROL
10. DATA CENTER STRAT.