Abstract
Q~Q~(M§)NC?:§2/~QI~(f~I! ~4&~:~QJ~
RI!l:!~4,Ih!!l:!YI!l:I!I!l:J:~Jhl!l:pl:!!(;l!!l:
__
Read:- 1. Kerala Infrastructue Investment Fund (Amendment) Act 2016
2. G.O(Ms) No. 315/20l61Fin dated 08.08.2016
ORDER
As per the Government Order read as 2nd paper above, Government has issued
Guidelines for ensuring necessary standardisation and efficiency in preparation,
processing and implementation of proposals of projects funded by Kerala
Infrastructure Investment Fund Board (KIIFB).
Several infrastructure projects have been approved by Government to be
executed in Public Sector Mode with the financial assistance of Kerala Infrastructure
Investment Fund Board (KIIFB). The projects are to be executed through Special
Purpose Vehicles (SPVs). As these organizations are under the control of the
State/Central Government, they are bound to follow the rules, guidelines and norms
applicable for execution of public works following PWD/CPWD guidelines and
various directions by the State Government, Central Government, Comptroller &
Auditor General, National Green Tribunal, Central Vigilance Commission, State
Pollution Control Board, etc. However, it is observed that their internal procedures for
execution of works and contract management are not uniform. It is therefore found
necessary to issue the revised procedures and guidelines for planning & execution of
KIIFB assisted infrastructure projects by the various SPVs.
Government have examined the matter in detail and are pleased to issue the
revised procedures and guidelines given as annexure hereto in supersession of the
Guidelines issued vide the G.O. read as 2nd paper above.
To
Forwarded / By Order
~
Section Officer
ANNEXURE
PROCEDURES & GENERAL GUIDELINES
1.1. Projects can be registered with KIIFB provided they satisfy the conditions as per the Kerala
Infrastructure Investment Fund Act 1999 as amended vide the Kerala Infrastructure Investment
Fund (Amendment) Act, 2016. Such projects should have either been declared in the Budget
Speech or approved by the Council of Ministers for funding by KIIFB. The registration of the
project shall be initiated in the online KIIFB Project Portal after Administrative Sanction is
accorded for the Project/Sub-Project/Project component. The minimum Project cost shall be
above Rs.100 crore and that of a sub-project not less than Rs.10 crore.
1.1.1. On communication of the Administrative Sanction to KIIFB, the Administrative Department
will be given the Department User default login credentials by KIIFB for gaining access to
the Project Profile in the Project Portal. The project will have a unique code number which
shall be quoted in all further communications and documents relating to the project.
1.1.2. The Department User uploads the Administrative Sanction and preliminary details/concept
note of the project.
1.2. The Special Purpose Vehicle (SPV) for implementing the project shall be identified by the
Administrative Department and declared in the Administrative Sanction for the project.
1.2.1. Creation of SPV profile by the Administrative Department.
Alongwith uploading the project details the Department User will register the SPV in the
Project Portal and submit the SPV Profile.
1.2.2. Confirmation of SPV and generation of user login for SPV Administrator User by KIIFB.
KIIFB will verify the details and confirm the SPV registration. Thereafter, the default
SPV login and user credentials will be generated and communicated to the registered E-mail
address of the designated SPV Administrator User.
2.1. Pursuant to issuing the Administrative Sanction, Tripartite Agreement as per G.O. (Ms) No.
333/2017/Fin Dated 16-06-2017
07 shall be signed between the SPV, the Administrative Department
and KIIFB for implementing the project.
2.2. The Tripartite Agreement shall include two schedules, Schedule-1 shall contain details of all the
Administrative Sanctions issued with respect to the Project and Schedule-2 shall contain details
of Project components/sub-projects in accordance with each respective Technical Sanction. The
schedules and additions thereof shall be signed by all the parties as and when they are added to
the Tripartite Agreement. The Administrative Sanctions as well as the Technical Sanctions shall
be attached to the respective schedules. Additional schedules, if any, forming part of Schedule- 1
and Schedule-2 will be given English alphabetic numbering along with the respective schedule
number (eg. Schedule 1 (a),1(b); Schedule 2(a), 2(b) and so on after Schedule-1 and Schedule-2
respectively).
2.3. Schedule-1 may be signed between the parties after the grant of Administrative Sanction and
Schedule-2 shall be signed immediately after issuing of the Technical Sanction (TS) of the
Project/Sub-Project/ Project component.
2.4. The date of signing and attaching the Schedule of the Project/ Sub-Project/ Project component to
the Tripartite Agreement shall be considered as the start for all tracking and progress monitoring
purposes.
3.1. Detailed Project Report (DPR) shall be prepared by the SPV for all Projects identified for
implementation by availing assistance (partly/fully) from KIIFB. Separate DPRs shall be
prepared for Sub-Projects/ Project components if sanctioned separately. The DPR shall be a
comprehensive document containing a detailed estimate (sufficient for technical sanction
purpose) including the details as specified below wherever relevant. Any specifically relevant
additional information shall also be included in addition to the below listed details:-
o Salient Features / Executive Summary
o Requirement/Demand Analysis
o Functional Design
o Engineering Design
o Value Engineering
o Revenue Streams Evaluation
o Financial Estimates & Cost Projection
o Investment Criteria & Cost Benefit Analysis
o Risk Assessment & Mitigation Plans
o Environmental Aspects & Sustainability
o Statutory Clearances & Mandatory Approvals
o Work Breakdown Structure (WBS) & Implementation Schedule
o Project Management Organization & Plan
o Contract Management Methodology
o Quality Management Plans
o Operation & Maintenance Strategy
3.2. General templates for DPR for certain select sectors are available in the KIIFB website for
reference.
3.3. The DPR shall also mention if the project is receiving or likely to receive any alternate/additional
funds for meeting partial cost of the project or any part of the project which has been proposed or
already completed.
3.4. In general, the cost of construction, equipment purchase, cost for shifting of any utilities, land
acquisition etc. shall be permitted to be included in the total cost sanctioned. Any preliminary
expense for engineering and consultancy including preparation of DPR, cost of establishment /
project management charges, cost of quality control etc. shall not be included in the project cost
and should be met from the centage charges payable to the SPV as per G.O.(P) No. 61/2017/Fin.
Dated 09-05-2017.
4. Project Submission, Appraisal & Funding
4.1. After obtaining Administrative Sanction, SPV shall prepare and submit Project/Sub-Project/
Project component details as the case may be and its DPR in the Project Portal.
4.2. On evaluation of DPR by KIIFB, a Technical Appraisal Report (TAR) will be issued online and
clarification/rectification, if any proposed therein, shall be submitted by the SPV as a Compliance
Report to KIIFB.
4.3. After satisfactory completion of appraisal, the Project will be submitted to the Executive
Committee/ Board of KIIFB for approval of funding by KIIFB.
4.4. If the Executive Committee/Board is of the view that additional documents are required for the
submitted projects, the same may be called for from the SPV.
4.5. After funding approval for the Project is accorded by the Executive Committee/Board, KIIFB
shall issue a sanction order which shall include the approved project cost and other project
details.
4.6. The SPV User shall upload in the Project Portal a Baseline-0 Work Breakdown Structure (WBS)
of the Project/Sub-Project/Project component in accordance with the DPR. The WBS shall be
prepared in MS Project Software.
Note: The Executive Committee is delegated with powers for sanctioning non-revenue generating
projects costing upto Rs. 100 crore only. All revenue generating projects will be approved by the Board
irrespective of the estimated cost.
5. Land Acquisition
5.1. On obtaining Administrative Sanction for the project, SPVs may take advance action for land
acquisition proposed for the project by submitting the proposal as a separate sub-project and take
immediate necessary action to obtain separate funding approval from KIIFB for the land
acquisition, without awaiting completion of formalities for funding approval for the whole
project. For this, a preliminary report shall be submitted to KIIFB for appraisal and obtaining
approval of the Executive Committee/Board for in-principle funding approval. This report shall
contain the exact requirement of land (location, area, estimated acquisition rates and survey
numbers, where available) along with the project components.
5.2. On approval of the land acquisition proposal by the Board/Executive Committee in-principle
sanction for funding will be accorded by KIIFB, whereon the SPV shall commence the procedure
for land acquisition.
5.3. Subsequently, the funds for land acquisition as well as the administrative costs thereof will be
released by KIIFB to the Revenue authority concerned after the SPV submits the online payment
invoice and SPV’s connected sanction proceedings in the Project Portal when the relevant
demands are raised by the Revenue authority against the LA requisition submitted to the Revenue
authority by the SPV. The payment occurrence shall also be appropriately mapped by the SPV as
a payment-milestone in the online WBS to enable KIIFB to release the funds accordingly.
5.4. The SPV shall invariably follow all applicable government rules and procedures of land
acquisition.
6.1. Technical Sanction (TS) for a Project/Sub-Project/ Project component shall only be issued by the
Competent Authority having delegation of powers granted by Government.
6.2. In the absence of such competent authority, AD shall constitute a Technical Committee. TS
Authority for Civil/Electrical/Mechanical Works, shall as far possible have not less than three
technically competent officials as below:
i. An officer in the rank of Chief Engineer having knowledge about the specific sector from an
Engineering department under Government of Kerala. (In the event of non-availability of
suitable officers, retired officers not below the rank of CE/SE from GoK/GoI respectively may
be considered)
ii. A senior level technical person having the rank of CE or officer holding analogous post in
SPV.
iii. An experienced independent professional having sector specific knowledge.
6.3. For all other works like Electronics, IT etc., Administrative Department shall constitute Technical
Committee consisting of experts from the relevant fields.
6.4. TS shall be issued in the form of a proceedings by SPV. In cases of Civil Works, TS shall be
issued following CPWD/PWD norms and in accordance with the provisions, design, scope,
specifications and estimates in the DPR approved by KIIFB. The specifications adopted shall be
specified (CPWD/PWD/MORTH or any relevant standards as mentioned in DPR). TS process
shall be initiated immediately upon approval of fund (expenditure sanction) has been accorded by
KIIFB.
6.5. TS may be issued for the sub-projects separately or splitting the subprojects into
packages/phases/work components for justifiable technical reasons. The estimate for TS shall
include provisions and the components having sufficient details adequate for tendering process.
Lumpsum provisions shall be avoided.
6.6. The correctness of rates, measurements, design, specifications etc. will be the sole responsibility
of TS authority.
6.7. TS shall be issued only after finalising the Land Acquisition process and after ensuring the
availability of all necessary statutory clearances.
6.8. The estimate rates adopted in the TS shall be as per PRICE software being used in Govt. of
Kerala and any new item shall be introduced by incorporating it in PRICE. Where for any reason,
any item cannot be included in PRICE, the Technical Committee shall specifically approve the
item nomenclature and rate.
6.9. If there is an increase in the estimate cost as per TS which is beyond the corresponding approval
as per KIIFB, prior approval of KIIFB is required to proceed with the tendering process.
6.10. Any substantial change in the scope, design, name of the project and other relevant parameters
from the approved DPR shall be considered by TS authority with the prior approval of KIIFB
only.
6.11. The increase in estimate cost up to 10% may be approved by the CEO of KIIFB based on
specific justifiable technical requirements due to variation in scope, design, items and quantities,
subject to ratification by Board. Any higher variation above shall require the approval of
Executive Committee/Board.
6.12. In case of reduction in the estimate cost, the fund allotment will be deemed to be limited to that
extent and earmarking and utilization of the savings for other components are not permissible.
6.13. TS authority shall review and take appropriate decisions on all important aspects referred to in
the DPR, as issues to be finalized at TS Stage.
6.14. A working DPR refined based on the details of Technical Sanction along with abstract schedule
(with item quantity and estimate rate only) and details of measurement, specifications, drawings
adopted, detailed Work Break-down Structure (WBS) and program schedule in line with the
KIIFB project management system and all other relevant details for implementation of the project
as per the originally approved DPR shall be submitted to KIIFB.
7. Tendering & Contract Management
7.1. Tendering Process
7.1.1. The SPV shall follow a competitive e-tendering process strictly following the rules and
guidelines prevailing in GoK/GoI.
7.1.2. The bidding documents shall be either as per CPWD/PWD norms or approved by the
respective government department which controls the SPV. In case the SPV desires to
follow their own standard bidding documents, it shall be ensured that no additional liabilities
and contractual/legal risks are likely to arise due to the variations from the standard
documents adopted in CPWD/PWD.
7.1.3. SPV shall ensure that adequate provisions are available in the bidding document for
implementing the various provisions in the tripartite agreement.
7.1.4. There shall be adequate publicity and sufficient period for tendering as per CPWD/PWD
guidelines shall be given for the bidders to effectively participate in the process.
10.1. All the payments to the SPV and the Contractor will be online.
10.2. Based on the Contract Agreement, the Contractor shall submit the bill to the SPV. After
examination of the Bill, the SPV shall issue proceedings for payment.
10.2.1. SPV user shall upload the proceedings issued by the SPV for payment along with the copy
of the bill passed for payment by the SPV.
10.2.2. Details of the Bill, payment recommended, deductions, applicable taxes, retention money,
cumulative details of payment already made, etc shall be entered by the SPV in the online
invoice in the Project Portal.
10.2.3. After verification of the submitted details KIIFB will make online payment to the
contractor direct to his designated bank account registered by the SPV in the Project Portal.
10.2.3.1. The statutory and other deductions in the bill will be given to the SPV by KIIFB
for remitting the amount to the authorities concerned.
10.2.3.2. The retention amount will be transferred to the SPV alongwith the bill deductions
and the same shall be released to the Contractor only after the completion of contractual
obligations.
10.2.3.3. All retention money shall be maintained by the SPV in a separate non- interest
bearing Spl.TSB Account in the Government Treasury only.
10.3. If the fund release requisitions are not received within 2 weeks after the specific payment
milestone has expired, the payment will be deferred to the next payment milestone and no
interim payment will be entertained in between the payment milestones.
10.4. The physical progress of the work will be compared against the payment milestone.
10.5. Executive Committee of KIIFB chaired by Minister (Finance) will periodically review the
progress of the project and oversee the utilisation and release of funds.
11.3 The Inspection Authority in KIIFB will monitor the execution of the project at various stages and its
variation from agreed scope, design, timelines, cost, quality, contract, etc.