Mine Legislation & General Safety
Mine Legislation & General Safety
Mine Legislation & General Safety
in
(All Mining Solutions)
DISCUSSION FORUM
CALL/WHATSAPP- 8804777500
VISITING SITE- www.MINEPORTAL.in Facebook- www.fb.com/mineportal.in
EMAIL- [email protected]
ONLINE TEST SERIES FOR VARIOUS MINING EXAMS
NOTES ON
MINE LEGISLATION & GENERAL
SAFETY
TELEGRAM GROUP
FOR MINING NOTES/NEWS/JOBS LINK - t.me/only_mining
or
SEARCH MINING STUDY MATERIAL in telegram
Fatality rate : It is the rate of which losing of life of any person in mine.
Miss Fire : Miss fire means the failure explodes of an entire charge of
explosive in a shot hole.
Face : Face means the moving front of any working place or the in bye
end of any drive level, cross cut raise or winze.
Public road : Public road means a road maintained for public use and
under the jurisdiction of any government or local authority.
Tub : Tub includes a wagon, car, truck, hutch, bandy, bucket or any
other vehicle for conveying material but doesn’t include a railway
wagon.
Mine : Mine means any excavation where any operation for the
purpose of searching for obtaining mineral has been or being carried
on.
Canteen : Mines rule 1955 has a provision under rule by that every
mines where more than 250 persons are the ordinary employed, there
shall be made a canteen by the owner and agent.
Workman inspector : For every mine where more than 500 person
are ordinary employed, the owner, agent or manager shall appoint a
workman inspector. He should be the technical expert to carry out the
inspection.
Calendar year : It means a year from the first day January to the 31st
day of December.
Man power distribution plan : For effective oms the exact man power
planning is needed. Every staffing cost a lot of to a company and lower
staff may affect the efficiency. Therefore the human resources
management plan and forecast the manpower is needed in present &
future expansion of the business. In mines shift wise man power
planning is made for effective productions.
Freely duty of rest : For the purpose of full day relax system group of
batch or workers be lagging to same category be released from normal
works directed to attempt & a training centre for the required no. of
days training works.
7. He shall devote the whole of his time to his duties and shall not
leave the district, under his charge until the end of the shift.
Misfires :
1. Misfire means the failure to explode of entire charge of explosive
in a shot hole.
2. The number of shots which explode shall unless shots are fired
electrically be counted by the shot firer.
www.MINEPORTAL.in Call/Whatsapp- 8804777500 www.fb.com/mineportal.in
ONLINE TEST SERIES FOR VARIOUS MINING EXAMS
Emergency plan :
1. The manager of every mine having working below ground shall
prepare a general plan of action for use on time of emergency.
2. The plan shall outline the duties and responsibilities of each
mines official & including the telephone operator, so that each
person shall know his duties during fire or explosion or other
emergency cases.
3. The manager shall submit copy of the aforesaid emergency plan
prepaired by him to the regional inspector.
4. On receiving information of any emergency, the manager * in his
absence the principal official present of the surface shall
immediately put the emergency action plan in operation.
child birth & to provide for maternity benefit & certain other benefit.
This act has following features:-
1. No employee shall knowingly employ a woman in any
establishment during the six week immediately following the day 7
her delivery.
2. According to the provisions of acts she get the payment of
maternity benefit at the rate of average daily wages.
3. The maximum period for which any woman shall be entitled to
maternity benefit at the rate of daily wages.
4. Any woman for getting benefit under maternity benefit act may
give notice to her employer on prescribed form.
5. If a woman die before receiving such maternity benefit act may
give notice to her employer prescribed form.
6. If a woman die before receiving such maternity benefit or any
other amount, the employer shall pay such benefit or amount to
the person nominated by the woman.
Severity rate : The term severity may be defined as the total days of
disability per 100000 man hours of work explosive.
Total days of disability X 106
Severity = --------------------------------------------------------
Total man hours of work exposure.
Categories of workers :
(i) Loader & filler, (ii) Timber man, (iii) Line mistress, (iv) Over man or
foreman & sirder or blaster, (v) Haulage driver, (vi) Mechanics, (vii)
Pump attendants, (viii) Vocational trained person.
This may be spread over different mine workshop & mineral binding
plant.
Frequency rate :
www.MINEPORTAL.in Call/Whatsapp- 8804777500 www.fb.com/mineportal.in
ONLINE TEST SERIES FOR VARIOUS MINING EXAMS
Safety organization :
In a large mining company the safety organization may be held by a
director (safety) under who may be as follows.
1. Formulating with the general manager for the co-ordinate of &
communication of the safety matter.
2. Discussion with the general manager for the co-ordination *
communication of the safety matter.
3. connecting research in safety matter.
4. Formation of the safety research & standardization using in the
under ground.
5. Honour the safety policy formed by the director of the company &
find out the way & means for translating it into action.
6. Formulate methods for safety inspection & safety audit for their
mines.
Trade Union :
1. According to Indian trade union act 1926, trade union has been
defined as a combination or association of workmen as well as
that of employer for the purpose of regulating the relation between
the workmen or between employers & includes any federation of
two or more trade union.
2. Any 7 or more members of a trade union may apply for
registration of the union.
3. Any person of the age of 15 year & above can be member of a
registered trade union.
Man power distribution plan : for effective oms the exacts man
power planning included.
1. Over staffing cost a lot to a company and lower staff may effect
the efficiency. Therefore the human resources management plan
and forecast the man power is neeed in present & future
expansion of the business.
2. In mines shift wire man power planning is made for effective
production.
DGMS : Director of mines safety which comes under the labour of and
welfare department of Govt. of India and which deals with the safety &
misfire of worker of different mines with in India including Andaman &
Nicobar island.
Wage : Remunatition which paid to the workers for their work is known
as wages. It may be computed on daily basis weekly basis or monthly
basis.
First aid kit : The small first aid kit which can be take staff contains the
following item :
1. Structure with two blankets.
2. Splints with triangular bands to apply them.
3. Wool, cotton and adhesive plaster.
4. Roller bands.
5. Burn dressing & sterilized dressing.
6. Dettol sauren other equipments.
7. Adhesive, Sesser , safety pin & carbolic soap.
Industrial Fatigue : The word fatigue origin from the Latin word
Fatigue. It means some one very tired.
The workmen work in industrial in electrical, mechanical department
cause a fatigue, extreme tireless, brittleness in metal or other material
caused by repeated stress loose fitting clothing of a sort worn by
solider.
Forest Act :
1. The forest conservation Act come into force with effect from
October 1980. Under the Act, no forest act land can be used for
non-forest purpose except with the prior approval of the central
Govt. Non forest purpose means breaking up or clearing of any
forest land or its portion for any purpose other that the re-
forestation.
2. The approval granted under the act would ensure commitment on
the part of the mine owner to take due to care of the forest and
undertake a forestation to restore the land off cut by mining
operation.
3. The respect of the mining operation being carried on the forest
lands leased before the commencement of the forest
Conservation Act 1980 the approval of the central Govt. for the
use of forest land for any non forest area of purpose.
4. By circular issued in July 1986 the mining of environment and
forest has stated that mining is a non forest activity by approval of
the Central Govt. essential before a mining lease (ML) is granted.
The prospecting license (PL) need not be referred to the central
Govt. for prior approval do not cutting the tree or clearance of
forest.
5. All mining project should be referred to environment wing of the
department of environment & forest for environment clearance
simultaneously with the proposal for forest clearance.
The conservation rules should be provided :
1. Total mining lease area and forest area required.
2. Period of mining lease proposed.
3. Estimated reserve of each mineral are in the forest area.
4. Annual estimated production of mineral ore.
5. Nature of mining operation (opencast & under ground).
6. Plans for rehabilitation of the area after mining.
7. Gradient of the area where mining would be undertaken.
www.MINEPORTAL.in Call/Whatsapp- 8804777500 www.fb.com/mineportal.in
ONLINE TEST SERIES FOR VARIOUS MINING EXAMS
Haulage roadways :
1. The haulage roadway shall be of adequate dimensions, straight
and regular gradient.
2. The haulage roadways shall have tracks properly laid with rails of
adequate section.
3. Where haulage is affected by one or more rope.
4. At the top of every inclined plane at least one stope block.
5. At least one runway switch a distance greater than the length of a
sit or tubs by more than 10 m shall be provided.
6. Safety hook Jazz rail shall be provided.
7. Re-railer are provided at interval not more than 250 mt.
8. Where haulage roadways exceeding 30 mt length signal
arrangement shall be provide code of signal
One rap – Stop in motion.
Two raps – lower haul in slow.
Three raps – start when at rest.
Four raps – raise or haul out slowly.
9. No person other than a competent person or un-official shall give
any signal.
10. Adequately precautions shall be taken to prevent signal &
telephone wire from touching cable & other electrical apparatus.
11. Man holes shall be put less the 1.8 mt in height 1.2 mts in
depth & not less than 0.75 mts width but not more than 1 mt.
2. No person shall be read initiated until the fire or heating has been
extinguished or affectively scaled off and an examination has
been made by manager assistant manager underground manager
to declared to be mine safe or not.
3. Carbon monoxide shall be present in the place through out during
the whole time of sealing off or delay with fire.
4. Where sealing off dealing with fire going on the following
apparatus shall be available in near the place two smoke helmets
or other suitable birds.
Traveling roadway :
1. Traveling roadways shall be separate from haulage roadway
except specify by regional inspection.
2. Dimension of traveling roadway shall not be less than 1.8 meters
high thronged.
3. Where the traveling roadways exceeds 80° inclination their shall
be provided with suitable steps or ladders.
4. Where the inclinations exceeds 45° their shall be provided hand
rails or ropes in addition to the steps or ladders.
5. Where inclination exceeds 60° their shall be provided platforms at
intervals not more than 10 mts.
www.MINEPORTAL.in Call/Whatsapp- 8804777500 www.fb.com/mineportal.in
ONLINE TEST SERIES FOR VARIOUS MINING EXAMS
Aoulance of danger :
1. If a competent person found any danger in mines or district he
shall be immediately with draw the all person the mines or district
& should be fenced off.
2. The competent person shall immediately inform the superior
officer about the danger & shall record the fact in the book kept
under purpose.
3. The superior officer shall make or cause to be made by
competent person shall readmitted to the mine or district in
reported to be safe.
4. If the work of removing the danger as suspended before the
danger is removed the mines or district shall be secure by fenced
off.
5. Shall carry out such other cuties relating to the maintained issue
& return of safety lamp as may be specified by the manager or
assistant manager or under ground manager.
run at least one complete trip up & down the working portion of
the shaft.
Transport of explosive :
1. While explosive in bulk are lowered or raised in a shaft or winze a
distinguished the explosive or the person in-charge of explosive
shall travel in the same cage or bucket.
2. Every cage skip or bucket containing explosives shall be gently
lowered or raised & it shall be the duty of the banksman or
bellman as the case may be adequately warm the winding engine
as set in motion.
3. Where explosive are being carried on a ladder every case or
container shall be securely fastened to the person carrying it.
4. No person other than a blaster shall carry any priming cartridge
into a shaft which is in the course of being sunk.
Standard of lighting :
1. If any doubt a rises as to whether any lamp or light is of adequate
lighting performance or not it shall be referred to the chief
inspector for decision.
2. The chief inspector may from time to time notification in the official
gazette specify the type of lamp.
General lighting :
1. Adequate general lighting provided during working hours.
2. On like surface.
3. Where the natural light in sufficient.
4. In every engine house.
5. In the vicinity of every working shaft.
6. In every opencast working.
7. At every shaming or marshalling yard.
8. At every place where persons have to work.
Standard of ventilation :
1. It shall be duties of the owner agent or managers of every mines
to take such steps as are necessary for suturing there is
constantly produced in all part of the mine below ground in
ventilation adequate to clear away smoke, steam & dust to dilute
gases that one inflammable or noxious gas to harmless nor
ensure that.
2. The percentage of oxygen shall not less than 19%.
3. The % of CO2 or any noxious gas should not exceed 5%.
4. The % of inflammable gas should be exceeding 1.25%.
5. The regional inspector is of the opinion that the ventilation is not
adequate, he may by an order in writing require the installation &
maintenance of such mechanical ventilation as is capable of
producing adequate ventilation in the mine or part.
Auxiliary Fan :
Locomotive :
1. No locomotive shall be used belowground other wise than in
accordance with the permission in writing of the chief inspector &
subject to such condition.
2. No locomotive shall be used where the gradient exceeds 1 in 15.
3. No person other than the driver shall ride on any locomotive
unless authorized in writing to do so by the manager.
4. Except during shunting operations, the locomotive shall lead the
tubs or set or train of tubs.